DIAPHRAGM,ACTUATOR,TYPE VP55,CS

Material 4100046840 · DIAPHRAGM · Plant 1000

AReorderCriticalStockout
Material
4100046840
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (17 of 23 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~134 days; expected demand during lead time 0.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 23 FuncLoc(s), 17 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 26.3M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Last turnaround used 1Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 50%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 282 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 23 functional locations

17 with criticality A/B · 27 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-621
PP-902B OUTLET FLOW
A141.39
PX_FCV-1054
CONTROL VALVE
A120.54
PX_TCV-584B
TEMPERATURE CONTROL VALVE
A120.55
PX_FCV-485
CONTROL VALVE
A100.11
PX_PCV-1780C
PRESSURE CONTROL VALVE
A100.08
PY_PCV-437A
BY PASS DUCT
A100.08
PX_LCV-589B
PP-389 LEVEL CONTROL
B120.55
PX_LCV-482
CL-899 LEVEL CONTROL
B110.12
PX_LCV-809
LEVEL CONTROL VALVE
B110.12
PX_PCV-1925B
BY PASS DUCT
B110.08
PX_FCV-407B
BY PASS LINE
B100.11
PX_LCV-1053C
HE-1091 LEVEL CONTROL
B200.12

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026LowPX_FCV-651Overhaul FCV-651
01 Sept 2026MediumPX_TCV-584BLeak from packing
20 Aug 2026MediumPX_FCV-651[MSI-B-26-RWX-113/M] Replace line
28 Jun 2026MediumPX_FCV-621Install scaffolding at FCV-621
30 May 2026LowPX_LCV-589BLCV-589B stuck
22 Jan 2026MediumPX_FCV-621Leak from packing
07 Dec 2025MediumPX_FCV-1054[MSI-B-25-YGT-214/M] Replace line
24 Sept 2025LowPX_FCV-621Replace lamp as per PM finding
18 Jul 2025HighPX_FCV-621FCV-621 stuck
30 May 2025MediumPX_LCV-841CLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
23 Dec 20251201000020470Corrective
17 Nov 20251203000037311Turnaround