Sparely
DU

DIAPHRAGM,ACTUATOR,TYPE VB425,SS316

Material 4100046847 · DIAPHRAGM · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100046847
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (10 of 19 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
117 d · P80 132 d
Unit price
Rp 8.7M

Recommendation

  • 1.Forecast 2.3 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~117 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Long lead time: 80% of deliveries took up to 132 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 19 FuncLoc(s), 10 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 52.3M · order by 01 Oct 2026
Expected arrival ≈ 117 days
Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 40%
Unit price
Rp 8.7M
PO history
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 332 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 19 functional locations

10 with criticality A/B · 21 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1256
PP-1570A TEMP CONTROL
A141.40
PX_PCV-527B
PRESSURE CONTROL VALVE
A110.08
PY_LCV-1700
VD-1637 LEVEL CONTROL
A110.12
PX_FCV-1081A
CONTROL VALVE
A100.11
PX_FCV-665
VD-339 OUTLET FLOW
B120.54
PX_FCV-1021
DEMIN WATER FLOW CONTROL
B100.11
PX_FCV-1753
BY PASS LINE
B100.11
PX_TCV-1095
HE-882D TEMP CONTROL
B100.12
PX_TCV-776
TEMPERATURE CONTROL VALVE
B100.12
PY_LCV-1056
LEVEL CONTROL VALVE
B100.12
PX_FCV-919A
DEMIN WATER FLOW CONTROL
C120.54
PX_LCV-1043
KC-279C LEVEL CONTROL
C300.12

Lead time and procurement

Lead time 117 ± 69 days (PO history, 3 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
17 Feb 2026PR06
Regular replenishment
2Rp 8.7M29 Jul 2026162 d
28 Jul 2025PR06
Regular replenishment
2Rp 8.7M19 Sept 202553 d
26 May 2025PR03
Regular replenishment
1Rp 9.3M21 Aug 202587 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Sept 2027PX_LCV-775Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026MediumPX_TCV-1934TCV-1934; IA leak from regulator
30 Jul 2026LowPX_TCV-1256TCV-1256; IA leak from regulator
29 Jul 2026MediumPX_TCV-1256Overhaul TCV-1256
30 Jun 2026MediumPX_FCV-919AFCV-919A; IA leak from regulator
01 May 2026LowPX_FCV-665FCV-665; valve hunting
16 Apr 2026MediumPX_TCV-1256Replace lamp as per PM finding
18 Jun 2025LowPX_TCV-1934TCV-1934 passing
25 May 2025LowPX_FCV-665Repair insulation FCV-665
19 May 2025MediumPY_LCV-1700LCV-1700; small leak at packing
17 May 2025LowPX_FCV-919APSM25/FCV-919A; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Nov 20251201000038265Corrective