DIAPHRAGM,ACTUATOR,SIZE CQ743,GRAPHITE
Material 4100046850 · DIAPHRAGM · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100046850
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 15 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 4.5 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
- 2.Lead time ~134 days; expected demand during lead time 0.9.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
- 4.On hand 5 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 15 FuncLoc(s), 6 of them criticality A/B.
- 6.ML early warning: 38% probability of demand in the next 90 days.
Proposed purchase requisition
5 EA
Rp 21.9M · order by 01 Oct 2026
Expected arrival ≈ 134 days
ML early warningPrice estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 38% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 279 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.
Installed on 15 functional locations
6 with criticality A/B · 19 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1747 BY PASS DUCT | A | 3 | 0 | 0.08 |
| PX_TCV-1233 PP-1599A TEMP CONTROL | A | 2 | 0 | 0.12 |
| PX_FCV-408 QUENCH OIL FLOW CONTROL | B | 1 | 1 | 0.54 |
| PX_FCV-804 CONTROL VALVE | B | 1 | 0 | 0.11 |
| PX_PCV-266B BY PASS DUCT | B | 1 | 0 | 0.08 |
| PY_LCV-916 VD-1908 LEVEL CONTROL | B | 1 | 0 | 0.12 |
| PX_PCV-1859 BY PASS DUCT | C | 1 | 4 | 1.36 |
| PX_FCV-236 BY PASS LINE | C | 2 | 1 | 0.54 |
| PX_FCV-1147 CONTROL VALVE | C | 1 | 0 | 0.11 |
| PX_FCV-1931A HE-1867D OUTLET FLOW | C | 1 | 0 | 0.11 |
| PX_LCV-1384 HE-694C LEVEL CONTROL | C | 1 | 0 | 0.12 |
| PX_LCV-995 LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Apr 2027 | PX_PCV-1747 | Final Element Overhaul; CV | 2.15 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Apr 2026 | Medium | PX_PCV-1859 | Replace lamp as per PM finding |
| 22 Dec 2025 | Medium | PX_PCV-1859 | PCV-1859; small leak at packing |
| 13 Nov 2025 | Low | PX_PCV-1859 | Overhaul PCV-1859 |
| 19 Aug 2025 | Medium | PX_FCV-408 | Install cover plate for MCP cracking |
| 22 Jun 2025 | Low | PX_FCV-236 | Repair insulation FCV-236 |
| 28 May 2025 | Medium | PX_PCV-1859 | Overhaul PCV-1859 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Dec 2025 | 2 | 201000014032 | Corrective |
| 26 Dec 2025 | 1 | 201000014032 | Corrective |
| 01 Jun 2025 | 1 | 201000016743 | Corrective |