DIAPHRAGM,ACTUATOR,SIZE CQ743,GRAPHITE

Material 4100046850 · DIAPHRAGM · Plant 1000

AReorderNormalSlow-moving
Material
4100046850
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 15 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 4.5 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
  • 2.Lead time ~134 days; expected demand during lead time 0.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 15 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 38% probability of demand in the next 90 days.
Proposed purchase requisition
5 EA
Rp 21.9M · order by 01 Oct 2026
Expected arrival ≈ 134 days
ML early warningPrice estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 38% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 279 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 15 functional locations

6 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1747
BY PASS DUCT
A300.08
PX_TCV-1233
PP-1599A TEMP CONTROL
A200.12
PX_FCV-408
QUENCH OIL FLOW CONTROL
B110.54
PX_FCV-804
CONTROL VALVE
B100.11
PX_PCV-266B
BY PASS DUCT
B100.08
PY_LCV-916
VD-1908 LEVEL CONTROL
B100.12
PX_PCV-1859
BY PASS DUCT
C141.36
PX_FCV-236
BY PASS LINE
C210.54
PX_FCV-1147
CONTROL VALVE
C100.11
PX_FCV-1931A
HE-1867D OUTLET FLOW
C100.11
PX_LCV-1384
HE-694C LEVEL CONTROL
C100.12
PX_LCV-995
LEVEL CONTROL VALVE
C100.12

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Apr 2027PX_PCV-1747Final Element Overhaul; CV2.15

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Apr 2026MediumPX_PCV-1859Replace lamp as per PM finding
22 Dec 2025MediumPX_PCV-1859PCV-1859; small leak at packing
13 Nov 2025LowPX_PCV-1859Overhaul PCV-1859
19 Aug 2025MediumPX_FCV-408Install cover plate for MCP cracking
22 Jun 2025LowPX_FCV-236Repair insulation FCV-236
28 May 2025MediumPX_PCV-1859Overhaul PCV-1859

Recent goods issues

Posting dateQtyOrderOrder type
26 Dec 20252201000014032Corrective
26 Dec 20251201000014032Corrective
01 Jun 20251201000016743Corrective