Sparely
DU

DIAPHRAGM,ACTUATOR,SIZE BW398,CS

Material 4100046882 · DIAPHRAGM · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100046882
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (10 of 20 FuncLocs A/B)
Supplier
HOKUTO INSTRUMENT CO LTD
Lead time
116 d · P80 191 d
Unit price
Rp 4.9M

Recommendation

  • 1.Forecast 2.9 EA/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~116 days; expected demand during lead time 0.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 4.On hand 2 + on order 2 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 20 FuncLoc(s), 10 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 19.5M · order by 01 Oct 2026
Expected arrival ≈ 116 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
2 / 2
next delivery 19 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 4.9M
PO history
ML early warning: 26% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 290 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 20 functional locations

10 with criticality A/B · 23 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1448
RECYCLE ETHANE FLOW CONTROL
A140.96
PX_FCV-459B
HYDROGEN FLOW CONTROL
A130.96
PY_LCV-897
HE-1660A LEVEL CONTROL
A131.40
PY_FCV-894
CONDENSATE FLOW CONTROL
A120.96
PX_FCV-645
CONTROL VALVE
A210.11
PX_PCV-262
VD-1729 PRESSURE CONTROL
A100.08
PX_TCV-1749
HE-1507C TEMP CONTROL
A100.12
PX_TCV-1965A
PP-915A TEMP CONTROL
A100.12
PX_PCV-1103
PRESSURE CONTROL VALVE
B130.51
PY_LCV-1623
PP-1721A LEVEL CONTROL
B100.12
PX_TCV-385
TEMPERATURE CONTROL VALVE
C162.26
PX_LCV-256
LEVEL CONTROL VALVE
C141.40

Lead time and procurement

Lead time 116 ± 82 days (PO history + category, 2 PO lines) · on-time 60%

PR dateTypeQtyUnit priceDeliveryLead time
14 Sept 2026PR03
Regular replenishment
2Rp 4.8M19 Jan 2027
open
127 d
16 May 2025PR06
Regular replenishment
2Rp 5.0M05 Jul 202550 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Sept 2026HighPX_TCV-771TCV-771 passing
28 Aug 2026LowPX_LCV-256LCV-256; valve hunting
04 Aug 2026LowPX_FCV-459BFCV-459B stuck
14 Jul 2026LowPX_FCV-1448Install scaffolding at FCV-1448
29 Jun 2026LowPX_FCV-1448FCV-1448; IA leak from regulator
26 Jun 2026MediumPX_PCV-1103PCV-1103; IA leak from regulator
12 Jun 2026MediumPX_TCV-385TCV-385 passing
05 Jun 2026MediumPX_LCV-256LCV-256; valve hunting
25 May 2026MediumPX_FCV-459BFCV-459B passing
09 May 2026MediumPY_LCV-897Overhaul LCV-897

Recent goods issues

Posting dateQtyOrderOrder type
15 Dec 20251201000022685Corrective
01 Nov 20251201000025438Corrective