Sparely
DU

DIAPHRAGM,ACTUATOR,SIZE JX247,PTFE

Material 4100046883 · DIAPHRAGM · Plant 1000

AReorderCriticalStockout
Material
4100046883
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 11 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~134 days; expected demand during lead time 0.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 11 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 26.3M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 50%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 227 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 11 functional locations

4 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1022A
LEVEL CONTROL VALVE
A141.40
PX_TCV-413C
TEMPERATURE CONTROL VALVE
A120.12
PX_FCV-1588
PP-1325 OUTLET FLOW
A410.11
PX_PCV-1011A
PRESSURE CONTROL VALVE
A100.08
PX_FCV-1967
CONTROL VALVE
C162.25
PX_PCV-139
BY PASS DUCT
C320.94
PX_FCV-1410A
VD-181 OUTLET FLOW
C110.54
PX_LCV-1627D
LEVEL CONTROL VALVE
C100.12
PX_PCV-1759B
BY PASS DUCT
C100.08
PX_PCV-1992
BY PASS DUCT
C100.08
PX_TCV-1995
TEMPERATURE CONTROL VALVE
C100.12

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Aug 2026HighPX_TCV-413CInstall scaffolding at TCV-413C
12 Aug 2026LowPX_LCV-1022ALeak from packing
09 Jun 2026MediumPX_FCV-1967FCV-1967 passing
22 May 2026LowPX_LCV-1022AOverhaul LCV-1022A
22 Apr 2026MediumPX_PCV-139Overhaul PCV-139
12 Apr 2026MediumPX_FCV-1967FCV-1967; IA leak from regulator
03 Feb 2026MediumPX_LCV-1022ALCV-1022A; IA leak from regulator
21 Jan 2026MediumPX_FCV-1967FCV-1967; IA leak from regulator
11 Jan 2026MediumPX_FCV-1967FCV-1967; small leak at packing
01 Nov 2025LowPX_FCV-1967Install scaffolding at FCV-1967

Recent goods issues

Posting dateQtyOrderOrder type
16 Feb 20261201000035346Corrective