DIAPHRAGM,ACTUATOR,SIZE NV280,MONEL

Material 4100046921 · DIAPHRAGM · Plant 1000

AReduceNon-moving
Material
4100046921
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~134 days; expected demand during lead time 0.8 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 431 exceeds the level to keep (3) by 428.
  • 5.Installed on 7 FuncLoc(s), 5 of them criticality A/B.
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
431 / 0
no open PO
Today Min / Max
10 / 20
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 98.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 7 functional locations

5 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1152
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_FCV-1863
BY PASS LINE
A100.11
PX_TCV-147
KC-717 TEMP CONTROL
A100.12
PX_FCV-303
BY PASS LINE
B120.96
PX_PCV-1940
VD-928B PRESSURE CONTROL
B100.08
PY_LCV-1154A
VD-1129 LEVEL CONTROL
C130.97
PX_FCV-1932
BY PASS LINE
C100.11

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Feb 2027PX_FCV-1932Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Aug 2026MediumPX_FCV-303Leak from packing
05 Nov 2025MediumPY_LCV-1154ALCV-1154A passing
23 Aug 2025LowPY_LCV-1154ALCV-1154A; valve hunting
13 Jul 2025MediumPX_FCV-303Leak from packing
17 May 2025MediumPY_LCV-1154AOverhaul LCV-1154A

Recent goods issues

Never issued in the 17-month history.