Sparely
DU

DIAPHRAGM,ACTUATOR,SIZE EV892,SS304

Material 4100046965 · DIAPHRAGM · Plant 1000

AReorderNormalBelow reorder point
Material
4100046965
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 14 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 3.1 EA/year: 2.3 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~134 days; expected demand during lead time 1.6 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 14 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 35.1M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
10
order qty 4
Service level
100.0%
stockout risk now 21%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 177 days ago, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 14 functional locations

6 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-723
C3 RECYCLE FLOW CONTROL
A120.54
PX_PCV-750
BY PASS DUCT
A120.94
PX_LCV-669
PP-1279 LEVEL CONTROL
A100.12
PX_PCV-1373A
BY PASS DUCT
A100.08
PX_PCV-194
HE-1680D PRESSURE CONTROL
A100.08
PX_FCV-1853
VD-1252 OUTLET FLOW
B100.11
PX_PCV-1859
BY PASS DUCT
C141.36
PX_FCV-465
PP-1029C OUTLET FLOW
C120.54
PX_FCV-870
PP-1748 OUTLET FLOW
C120.54
PX_FCV-404
QUENCH OIL FLOW CONTROL
C100.11
PX_FCV-825
GASOLINE FLOW CONTROL
C100.11
PX_LCV-492
HE-337B LEVEL CONTROL
C100.12

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_PCV-1373AFinal Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_FCV-723[MSI-B-26-SFU-129/M] Replace line
11 Aug 2026MediumPX_FCV-870[MSI-B-26-FHG-172/M] Replace line
19 Apr 2026MediumPX_PCV-750PCV-750; small leak at packing
16 Apr 2026MediumPX_PCV-1859Replace lamp as per PM finding
22 Dec 2025MediumPX_PCV-1859PCV-1859; small leak at packing
13 Nov 2025LowPX_PCV-1859Overhaul PCV-1859
08 Oct 2025MediumPX_FCV-465Painting FCV-465
27 Jul 2025MediumPX_FCV-465Overhaul FCV-465
05 Jun 2025HighPX_PCV-750Overhaul PCV-750
30 May 2025LowPX_FCV-723Overhaul FCV-723

Recent goods issues

Posting dateQtyOrderOrder type
07 Apr 20261201000006132Corrective
10 Jan 20261201000009702Corrective
16 Dec 20251201000022685Corrective
15 Dec 20251201000022685Corrective