DIAPHRAGM,ACTUATOR,SIZE WS199,NBR

Material 4100047000 · DIAPHRAGM · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100047000
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 10 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
104 d · P80 92 d
Unit price
Rp 11.9M

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~104 days; expected demand during lead time 0.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 10 FuncLoc(s), 3 of them criticality A/B.
  • 7.ML early warning: 31% probability of demand in the next 90 days.
Proposed purchase requisition
5 EA
Rp 59.7M · order by 01 Oct 2026
Expected arrival ≈ 104 days
Long-leadML early warningConvert to Stock ItemLast turnaround used 7Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 39%
Unit price
Rp 11.9M
PO history
ML early warning: 31% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 166 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (7 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 10 functional locations

3 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1324
BY PASS LINE
A100.11
PX_PCV-1988
PP-1011D PRESSURE CONTROL
A100.08
PX_TCV-852
TEMPERATURE CONTROL VALVE
A100.12
PX_FCV-1206
CONTROL VALVE
C100.11
PX_PCV-1025
PRESSURE CONTROL VALVE
C100.08
PX_PCV-429
BY PASS DUCT
C100.08
PX_TCV-517B
TEMPERATURE CONTROL VALVE
C100.12
PY_FCV-916B
BY PASS LINE
C100.11
PX_LCV-1295
LEVEL CONTROL VALVE
S151.83
PX_LCV-1123D
LEVEL CONTROL VALVE
S100.12

Lead time and procurement

Lead time 104 ± 43 days (PO history, 4 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
09 Jun 2026PR06
Regular replenishment
4Rp 11.8M07 Sept 202690 d
30 May 2026PR06
Regular replenishment
2Rp 12.0M01 Aug 202663 d
01 May 2026PR03
Regular replenishment
3Rp 11.8M04 Aug 202695 d
15 Oct 2025PR03
Regular replenishment
4Rp 12.0M31 Dec 202577 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Jun 2026LowPX_LCV-1295Leak from packing
08 Mar 2026LowPX_LCV-1295Repair insulation LCV-1295
08 Dec 2025MediumPX_LCV-1295Replace lamp as per PM finding
23 Nov 2025LowPX_LCV-1295[MSI-B-25-CPX-374] Permanent repair
05 May 2025MediumPX_LCV-1295Repair insulation LCV-1295

Recent goods issues

Posting dateQtyOrderOrder type
18 Apr 20261204000014883Preventive
07 Feb 20261201000011728Corrective
11 Jan 20261201000038141Corrective
25 Dec 20252203000001878Turnaround
25 Dec 20253203000001878Turnaround
23 Dec 20252203000001878Turnaround