DIAPHRAGM,ACTUATOR,TYPE LY448,MONEL

Material 4100047049 · DIAPHRAGM · Plant 1000

BReorderCriticalStockout
Material
4100047049
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~134 days; expected demand during lead time 0.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 26%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 138 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 206.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~46 days.

Installed on 5 functional locations

1 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1448D
HE-278D TEMP CONTROL
B300.12
PX_FCV-684C
CONTROL VALVE
C130.96
PX_FCV-867
BY PASS LINE
C120.54
PX_FCV-404
QUENCH OIL FLOW CONTROL
C100.11
PX_PCV-474
PP-1656A PRESSURE CONTROL
C200.08

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Jul 2026LowPX_FCV-684CFCV-684C; IA leak from regulator
23 Dec 2025MediumPX_FCV-867Replace lamp as per PM finding
21 Dec 2025MediumPX_FCV-684CFCV-684C; IA leak from regulator
17 May 2025MediumPX_FCV-684CFCV-684C stuck
15 May 2025MediumPX_FCV-867Overhaul FCV-867

Recent goods issues

Posting dateQtyOrderOrder type
16 May 20261201000001121Corrective