DIAPHRAGM,ACTUATOR,TYPE LY448,MONEL
Material 4100047049 · DIAPHRAGM · Plant 1000
BReorderCriticalStockout
- Material
- 4100047049
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~134 days; expected demand during lead time 0.3.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 26%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 138 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 206.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~46 days.
Installed on 5 functional locations
1 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-1448D HE-278D TEMP CONTROL | B | 3 | 0 | 0.12 |
| PX_FCV-684C CONTROL VALVE | C | 1 | 3 | 0.96 |
| PX_FCV-867 BY PASS LINE | C | 1 | 2 | 0.54 |
| PX_FCV-404 QUENCH OIL FLOW CONTROL | C | 1 | 0 | 0.11 |
| PX_PCV-474 PP-1656A PRESSURE CONTROL | C | 2 | 0 | 0.08 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Jul 2026 | Low | PX_FCV-684C | FCV-684C; IA leak from regulator |
| 23 Dec 2025 | Medium | PX_FCV-867 | Replace lamp as per PM finding |
| 21 Dec 2025 | Medium | PX_FCV-684C | FCV-684C; IA leak from regulator |
| 17 May 2025 | Medium | PX_FCV-684C | FCV-684C stuck |
| 15 May 2025 | Medium | PX_FCV-867 | Overhaul FCV-867 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 May 2026 | 1 | 201000001121 | Corrective |