Sparely
DU

DIAPHRAGM,ACTUATOR,MODEL QM616,VITON

Material 4100047065 · DIAPHRAGM · Plant 1000

AReorderCriticalStockout
Material
4100047065
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~134 days; expected demand during lead time 0.7 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 100%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 72.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 5 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-621
PP-902B OUTLET FLOW
A141.39
PX_FCV-1092A
BY PASS LINE
A410.11
PX_FCV-1761
FLUSHING OIL FLOW CONTROL
B100.11
PY_LCV-974
LEVEL CONTROL VALVE
C100.12
PX_PCV-1908A
PRESSURE CONTROL VALVE
S100.08

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PY_LCV-974Final Element Overhaul; CV0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Jun 2026MediumPX_FCV-621Install scaffolding at FCV-621
22 Jan 2026MediumPX_FCV-621Leak from packing
24 Sept 2025LowPX_FCV-621Replace lamp as per PM finding
18 Jul 2025HighPX_FCV-621FCV-621 stuck
25 May 2025MediumPX_FCV-1092AInstall cover plate for MCP cracking

Recent goods issues

Never issued in the 17-month history.