Sparely
DU

DIAPHRAGM,ACTUATOR,SIZE MM165,SS304

Material 4100047077 · DIAPHRAGM · Plant 1000

AReorderNormalSlow-moving
Material
4100047077
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 2.7 EA/year: 2.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~134 days; expected demand during lead time 1.0.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 21.9M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
9
order qty 3
Service level
99.8%
stockout risk now 1%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 212 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 5 functional locations

2 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1300B
BY PASS DUCT
A140.94
PX_PCV-318
PRESSURE CONTROL VALVE
B100.08
PX_TCV-745
PP-1161 TEMP CONTROL
C230.98
PY_FCV-458
PP-448 OUTLET FLOW
C100.11
PX_PCV-1276
PP-1899 PRESSURE CONTROL
S100.08

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Sept 2026LowPX_TCV-745TCV-745; IA leak from regulator
27 Jul 2026MediumPX_TCV-745Install cover plate for MCP cracking
29 May 2026MediumPX_PCV-1300BPCV-1300B; small leak at packing
24 Mar 2026HighPX_PCV-1300BPainting PCV-1300B
20 Aug 2025MediumPX_PCV-1300BLeak from packing
22 Jul 2025LowPX_TCV-745Install scaffolding at TCV-745
28 May 2025MediumPX_PCV-1300BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Mar 20261201000006597Corrective
03 Mar 20262201000006597Corrective
12 Dec 20251201000008455Corrective
09 Oct 20252204000002500Preventive