DIAPHRAGM,ACTUATOR,MODEL AV244,MONEL

Material 4100047103 · DIAPHRAGM · Plant 1000

AReorderNormalSlow-moving
Material
4100047103
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~134 days; expected demand during lead time 0.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 17.5M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 2%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 292 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 8 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1236
KC-713B LEVEL CONTROL
A100.12
PX_FCV-1980A
PP-1810A OUTLET FLOW
B130.96
PY_TCV-441A
HE-275C TEMP CONTROL
C151.83
PX_PCV-1713
VD-1479 PRESSURE CONTROL
C141.36
PX_LCV-425A
LEVEL CONTROL VALVE
C120.55
PX_FCV-825
GASOLINE FLOW CONTROL
C100.11
PX_PCV-1968
PRESSURE CONTROL VALVE
C100.08
PX_PCV-538
HE-876B PRESSURE CONTROL
S100.08

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Sept 2026LowPY_TCV-441AReplace lamp as per PM finding
18 May 2026MediumPY_TCV-441AOverhaul TCV-441A
17 May 2026LowPY_TCV-441AOverhaul TCV-441A
05 May 2026LowPY_TCV-441ATCV-441A stuck
15 Mar 2026MediumPX_FCV-1980ARepair insulation FCV-1980A
01 Jan 2026MediumPX_LCV-425ALeak from packing
12 Dec 2025LowPX_PCV-1713PCV-1713; small leak at packing
03 Nov 2025MediumPX_PCV-1713PCV-1713 passing
28 Oct 2025MediumPX_PCV-1713Overhaul PCV-1713
31 Aug 2025LowPX_FCV-1980AFCV-1980A; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
13 Dec 20251201000032995Corrective