DIAPHRAGM,ACTUATOR,MODEL AV244,MONEL
Material 4100047103 · DIAPHRAGM · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100047103
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~134 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 17.5M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 2%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 292 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.
Installed on 8 functional locations
2 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1236 KC-713B LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_FCV-1980A PP-1810A OUTLET FLOW | B | 1 | 3 | 0.96 |
| PY_TCV-441A HE-275C TEMP CONTROL | C | 1 | 5 | 1.83 |
| PX_PCV-1713 VD-1479 PRESSURE CONTROL | C | 1 | 4 | 1.36 |
| PX_LCV-425A LEVEL CONTROL VALVE | C | 1 | 2 | 0.55 |
| PX_FCV-825 GASOLINE FLOW CONTROL | C | 1 | 0 | 0.11 |
| PX_PCV-1968 PRESSURE CONTROL VALVE | C | 1 | 0 | 0.08 |
| PX_PCV-538 HE-876B PRESSURE CONTROL | S | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PY_TCV-441A | Replace lamp as per PM finding |
| 18 May 2026 | Medium | PY_TCV-441A | Overhaul TCV-441A |
| 17 May 2026 | Low | PY_TCV-441A | Overhaul TCV-441A |
| 05 May 2026 | Low | PY_TCV-441A | TCV-441A stuck |
| 15 Mar 2026 | Medium | PX_FCV-1980A | Repair insulation FCV-1980A |
| 01 Jan 2026 | Medium | PX_LCV-425A | Leak from packing |
| 12 Dec 2025 | Low | PX_PCV-1713 | PCV-1713; small leak at packing |
| 03 Nov 2025 | Medium | PX_PCV-1713 | PCV-1713 passing |
| 28 Oct 2025 | Medium | PX_PCV-1713 | Overhaul PCV-1713 |
| 31 Aug 2025 | Low | PX_FCV-1980A | FCV-1980A; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Dec 2025 | 1 | 201000032995 | Corrective |