Sparely
DU

DIAPHRAGM,ACTUATOR,SIZE GY129,VITON

Material 4100047125 · DIAPHRAGM · Plant 1000

AReorderCriticalStockout
Material
4100047125
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 9 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 3.1 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
  • 2.Lead time ~134 days; expected demand during lead time 2.0 (incl. 1.4 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 9 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 43.8M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 4
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 100%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 46 days ago, 1 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 9 functional locations

3 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-868
TEMPERATURE CONTROL VALVE
A120.55
PX_TCV-779C
PP-1798C TEMP CONTROL
A100.12
PX_LCV-896A
LEVEL CONTROL VALVE
B300.12
PX_FCV-1447
ETHYLENE FLOW CONTROL
C131.39
PX_FCV-190
VD-813 OUTLET FLOW
C110.11
PX_PCV-962
PRESSURE CONTROL VALVE
C110.08
PX_FCV-619A
METHANOL FLOW CONTROL
C100.11
PX_FCV-818A
BY PASS LINE
C100.11
PX_PCV-1757B
PRESSURE CONTROL VALVE
S100.08

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
16 Dec 2026PX_FCV-619AFinal Element Overhaul; Control Valve0.72
17 Dec 2026PX_FCV-1447Final Element Overhaul; CV0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Aug 2026MediumPX_FCV-1447FCV-1447; IA leak from regulator
25 Dec 2025MediumPX_TCV-868[MSI-B-25-TDD-370] Permanent repair
30 Nov 2025HighPX_FCV-1447[MSI-B-25-JDZ-246] Permanent repair
14 Jun 2025MediumPX_FCV-1447FCV-1447 passing
22 May 2025LowPX_PCV-962Overhaul PCV-962
20 May 2025MediumPX_FCV-190Repair insulation FCV-190
11 May 2025HighPX_TCV-868PSM25/TCV-868; IA leak from regulator

Recent goods issues

Posting dateQtyOrderOrder type
16 Aug 20262204000039855Preventive
13 Feb 20262201000025107Corrective
27 Sept 20251201000032684Corrective