DIAPHRAGM,ACTUATOR,SIZE GY129,VITON
Material 4100047125 · DIAPHRAGM · Plant 1000
AReorderCriticalStockout
- Material
- 4100047125
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 9 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 3.1 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
- 2.Lead time ~134 days; expected demand during lead time 2.0 (incl. 1.4 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
- 5.Installed on 9 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 43.8M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 4
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 100%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 46 days ago, 1 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.
Installed on 9 functional locations
3 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-868 TEMPERATURE CONTROL VALVE | A | 1 | 2 | 0.55 |
| PX_TCV-779C PP-1798C TEMP CONTROL | A | 1 | 0 | 0.12 |
| PX_LCV-896A LEVEL CONTROL VALVE | B | 3 | 0 | 0.12 |
| PX_FCV-1447 ETHYLENE FLOW CONTROL | C | 1 | 3 | 1.39 |
| PX_FCV-190 VD-813 OUTLET FLOW | C | 1 | 1 | 0.11 |
| PX_PCV-962 PRESSURE CONTROL VALVE | C | 1 | 1 | 0.08 |
| PX_FCV-619A METHANOL FLOW CONTROL | C | 1 | 0 | 0.11 |
| PX_FCV-818A BY PASS LINE | C | 1 | 0 | 0.11 |
| PX_PCV-1757B PRESSURE CONTROL VALVE | S | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 16 Dec 2026 | PX_FCV-619A | Final Element Overhaul; Control Valve | 0.72 |
| 17 Dec 2026 | PX_FCV-1447 | Final Element Overhaul; CV | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Aug 2026 | Medium | PX_FCV-1447 | FCV-1447; IA leak from regulator |
| 25 Dec 2025 | Medium | PX_TCV-868 | [MSI-B-25-TDD-370] Permanent repair |
| 30 Nov 2025 | High | PX_FCV-1447 | [MSI-B-25-JDZ-246] Permanent repair |
| 14 Jun 2025 | Medium | PX_FCV-1447 | FCV-1447 passing |
| 22 May 2025 | Low | PX_PCV-962 | Overhaul PCV-962 |
| 20 May 2025 | Medium | PX_FCV-190 | Repair insulation FCV-190 |
| 11 May 2025 | High | PX_TCV-868 | PSM25/TCV-868; IA leak from regulator |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Aug 2026 | 2 | 204000039855 | Preventive |
| 13 Feb 2026 | 2 | 201000025107 | Corrective |
| 27 Sept 2025 | 1 | 201000032684 | Corrective |