Sparely
DU

DIAPHRAGM,ACTUATOR,MODEL EF967,INCOLOY

Material 4100047146 · DIAPHRAGM · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100047146
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
LANGIT MESINDO GLOBAL PT
Lead time
157 d · P80 191 d
Unit price
Rp 4.0M

Recommendation

  • 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~157 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 2 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 15.8M · order by 01 Oct 2026
Expected arrival ≈ 157 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 03 Oct 2028
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 2%
Unit price
Rp 4.0M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 115 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 6 functional locations

3 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1400
HE-1767 LEVEL CONTROL
A400.12
PX_PCV-820
HE-1547 PRESSURE CONTROL
A100.08
PX_FCV-1140A
HE-1074 OUTLET FLOW
B100.11
PY_TCV-441A
HE-275C TEMP CONTROL
C151.83
PX_PCV-139
BY PASS DUCT
C120.94
PX_PCV-962
PRESSURE CONTROL VALVE
C110.08

Lead time and procurement

Lead time 157 ± 82 days (PO history + category, 1 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jun 2026PR01
Import / long-lead
2Rp 4.0M03 Oct 2028
open
829 d
23 Dec 2025PR06
Regular replenishment
1Rp 4.0M06 Aug 2026226 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Sept 2026LowPY_TCV-441AReplace lamp as per PM finding
18 May 2026MediumPY_TCV-441AOverhaul TCV-441A
17 May 2026LowPY_TCV-441AOverhaul TCV-441A
05 May 2026LowPY_TCV-441ATCV-441A stuck
22 Apr 2026MediumPX_PCV-139Overhaul PCV-139
17 Jun 2025MediumPX_PCV-139[MSI-B-25-ZRC-367/M] Replace line
22 May 2025LowPX_PCV-962Overhaul PCV-962
19 May 2025LowPY_TCV-441ATCV-441A; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
08 Jun 20261201000007891Corrective