DIAPHRAGM,ACTUATOR,MODEL EF967,INCOLOY
Material 4100047146 · DIAPHRAGM · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100047146
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 6 FuncLocs A/B)
- Supplier
- LANGIT MESINDO GLOBAL PT
- Lead time
- 157 d · P80 191 d
- Unit price
- Rp 4.0M
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~157 days; expected demand during lead time 0.5.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 0 + on order 2 is at or below the reorder point: order 4 now.
- 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 15.8M · order by 01 Oct 2026
Expected arrival ≈ 157 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 03 Oct 2028
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 2%
Unit price
Rp 4.0M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 115 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.
Installed on 6 functional locations
3 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1400 HE-1767 LEVEL CONTROL | A | 4 | 0 | 0.12 |
| PX_PCV-820 HE-1547 PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_FCV-1140A HE-1074 OUTLET FLOW | B | 1 | 0 | 0.11 |
| PY_TCV-441A HE-275C TEMP CONTROL | C | 1 | 5 | 1.83 |
| PX_PCV-139 BY PASS DUCT | C | 1 | 2 | 0.94 |
| PX_PCV-962 PRESSURE CONTROL VALVE | C | 1 | 1 | 0.08 |
Lead time and procurement
Lead time 157 ± 82 days (PO history + category, 1 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Jun 2026 | PR01 Import / long-lead | 2 | Rp 4.0M | 03 Oct 2028 open | 829 d |
| 23 Dec 2025 | PR06 Regular replenishment | 1 | Rp 4.0M | 06 Aug 2026 | 226 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PY_TCV-441A | Replace lamp as per PM finding |
| 18 May 2026 | Medium | PY_TCV-441A | Overhaul TCV-441A |
| 17 May 2026 | Low | PY_TCV-441A | Overhaul TCV-441A |
| 05 May 2026 | Low | PY_TCV-441A | TCV-441A stuck |
| 22 Apr 2026 | Medium | PX_PCV-139 | Overhaul PCV-139 |
| 17 Jun 2025 | Medium | PX_PCV-139 | [MSI-B-25-ZRC-367/M] Replace line |
| 22 May 2025 | Low | PX_PCV-962 | Overhaul PCV-962 |
| 19 May 2025 | Low | PY_TCV-441A | TCV-441A; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jun 2026 | 1 | 201000007891 | Corrective |