Sparely
DU

DIAPHRAGM,ACTUATOR,TYPE UB146,GRAPHITE

Material 4100047169 · DIAPHRAGM · Plant 1000

BLong-leadMaintainCritical insurance spare
Material
4100047169
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
96 d · P80 191 d
Unit price
Rp 2.8M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~96 days; expected demand during lead time 0.0.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.2%
stockout risk now 0%
Unit price
Rp 2.8M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~46 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_FCV-476
CONTROL VALVE
B100.11
PX_FCV-919A
DEMIN WATER FLOW CONTROL
C120.54
PX_LCV-1028A
HE-1831D LEVEL CONTROL
C100.12

Lead time and procurement

Lead time 96 ± 82 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2025PR06
Regular replenishment
1Rp 2.9M15 Oct 202538 d
20 Aug 2025PR03
Regular replenishment
2Rp 2.8M29 Sept 202540 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Jun 2026MediumPX_FCV-919AFCV-919A; IA leak from regulator
17 May 2025LowPX_FCV-919APSM25/FCV-919A; small leak at packing

Recent goods issues

Never issued in the 17-month history.