DIAPHRAGM,ACTUATOR,SIZE NX745,A105

Material 4100047179 · DIAPHRAGM · Plant 1000

ALong-leadMonitorTAM reserve
Material
4100047179
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 9 FuncLocs A/B)
Supplier
TIRTA SEJAHTERA PERSADA PT
Lead time
144 d · P80 191 d
Unit price
Rp 3.1M

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~144 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Used only during the last turnaround (9 EA): keep it for the next one instead of treating it as slow-moving.
  • 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 9 FuncLoc(s), 5 of them criticality A/B.
Long-leadLast turnaround used 9Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.1M
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (9 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 121.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 9 functional locations

5 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1466B
BY PASS DUCT
A120.51
PX_LCV-1990
PP-1498C LEVEL CONTROL
A100.12
PX_PCV-1166
PRESSURE CONTROL VALVE
A100.08
PX_PCV-984
KC-984C PRESSURE CONTROL
A100.08
PX_FCV-1980A
PP-1810A OUTLET FLOW
B130.96
PX_PCV-372
PRESSURE CONTROL VALVE
C130.94
PX_FCV-1474
VD-444B OUTLET FLOW
C100.11
PX_LCV-1376
LEVEL CONTROL VALVE
C100.12
PX_LCV-637
LEVEL CONTROL VALVE
C100.12

Lead time and procurement

Lead time 144 ± 82 days (PO history + category, 2 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
27 Oct 2025PR03
Regular replenishment
2Rp 3.0M03 Mar 2026127 d
29 Jun 2025PR06
Regular replenishment
4Rp 3.2M07 Jan 2026192 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Sept 2026LowPX_PCV-1466BPCV-1466B; valve hunting
29 May 2026LowPX_PCV-372PCV-372 passing
15 Mar 2026MediumPX_FCV-1980ARepair insulation FCV-1980A
08 Feb 2026LowPX_PCV-372PCV-372; valve hunting
31 Aug 2025LowPX_FCV-1980AFCV-1980A; small leak at packing
23 May 2025LowPX_PCV-1466BReplace lamp as per PM finding
15 May 2025MediumPX_PCV-372PSM25/Overhaul PCV-372
08 May 2025LowPX_FCV-1980AFCV-1980A; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
23 Nov 20253203000038363Turnaround
22 Nov 20253203000038363Turnaround
18 Nov 20251203000038363Turnaround
18 Nov 20252203000038363Turnaround