DIAPHRAGM,ACTUATOR,SIZE KA639,SS304
Material 4100047235 · DIAPHRAGM · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100047235
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~134 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 3%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 142 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 764.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.
Installed on 3 functional locations
1 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1448 RECYCLE ETHANE FLOW CONTROL | A | 1 | 4 | 0.96 |
| PX_TCV-639 HE-1500B TEMP CONTROL | C | 3 | 2 | 0.55 |
| PX_FCV-1147 CONTROL VALVE | C | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Jul 2026 | Low | PX_FCV-1448 | Install scaffolding at FCV-1448 |
| 29 Jun 2026 | Low | PX_FCV-1448 | FCV-1448; IA leak from regulator |
| 22 Apr 2026 | Medium | PX_FCV-1448 | FCV-1448 stuck |
| 07 Dec 2025 | Medium | PX_TCV-639 | TCV-639; small leak at packing |
| 13 May 2025 | Low | PX_FCV-1448 | Replace lamp as per PM finding |
| 07 May 2025 | Medium | PX_TCV-639 | TCV-639; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 May 2026 | 1 | 201000022263 | Corrective |