DIAPHRAGM,ACTUATOR,SIZE VP853,VITON
Material 4100047259 · DIAPHRAGM · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100047259
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 2.9 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
- 2.Lead time ~134 days; expected demand during lead time 2.9 (incl. 2.9 planned).
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 6 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 21.9M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 2
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 100%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 463 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 57.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.
Installed on 6 functional locations
1 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1732 BFW FLOW CONTROL | A | 4 | 1 | 0.11 |
| PX_PCV-258 HE-1843C PRESSURE CONTROL | C | 1 | 3 | 0.94 |
| PX_LCV-993C HE-1251C LEVEL CONTROL | C | 1 | 0 | 0.12 |
| PX_PCV-540A PRESSURE CONTROL VALVE | C | 1 | 0 | 0.08 |
| PX_TCV-1394B PP-118B TEMP CONTROL | C | 1 | 0 | 0.12 |
| PY_PCV-922B BY PASS DUCT | C | 4 | 0 | 0.08 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Feb 2027 | PX_FCV-1732 | Final Element Overhaul; Control Valve | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Mar 2026 | Low | PX_PCV-258 | PCV-258; valve hunting |
| 10 Sept 2025 | Medium | PX_PCV-258 | Replace lamp as per PM finding |
| 25 May 2025 | Medium | PX_FCV-1732 | PSM25/FCV-1732 passing |
| 24 May 2025 | Low | PX_PCV-258 | PCV-258; valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jun 2025 | 2 | 204000014982 | Preventive |