DIAPHRAGM,ACTUATOR,TYPE NY647,MONEL

Material 4100047396 · DIAPHRAGM · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100047396
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
141 d · P80 191 d
Unit price
Rp 3.1M

Recommendation

  • 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~141 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 9.3M · order by 01 Oct 2026
Expected arrival ≈ 141 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 28 May 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 5%
Unit price
Rp 3.1M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 228 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 897.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 6 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-621
PP-902B OUTLET FLOW
A141.39
PX_TCV-946
TEMPERATURE CONTROL VALVE
A100.12
PX_FCV-1719A
LEAN AMINE FLOW CONTROL
B120.54
PX_LCV-1028A
HE-1831D LEVEL CONTROL
C100.12
PX_TCV-606
VD-887 TEMP CONTROL
C100.12
PX_TCV-697A
HE-113B TEMP CONTROL
S110.12

Lead time and procurement

Lead time 141 ± 82 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
30 Mar 2026PR05
Project / turnaround
1Rp 3.1M28 May 2027
open
424 d
05 Jan 2026PR06
Regular replenishment
2Rp 3.1M17 Jun 2026163 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Jun 2026MediumPX_FCV-621Install scaffolding at FCV-621
22 Jan 2026MediumPX_FCV-621Leak from packing
29 Sept 2025LowPX_FCV-1719AFCV-1719A passing
24 Sept 2025LowPX_FCV-621Replace lamp as per PM finding
02 Aug 2025MediumPX_TCV-697AInstall scaffolding at TCV-697A
18 Jul 2025HighPX_FCV-621FCV-621 stuck
04 May 2025MediumPX_FCV-1719AFCV-1719A; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
15 Feb 20261204000026249Preventive