DIAPHRAGM,ACTUATOR,TYPE NY647,MONEL
Material 4100047396 · DIAPHRAGM · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100047396
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 6 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 141 d · P80 191 d
- Unit price
- Rp 3.1M
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~141 days; expected demand during lead time 0.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
- 4.On hand 0 + on order 1 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 9.3M · order by 01 Oct 2026
Expected arrival ≈ 141 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 28 May 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 5%
Unit price
Rp 3.1M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 228 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 897.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.
Installed on 6 functional locations
3 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-621 PP-902B OUTLET FLOW | A | 1 | 4 | 1.39 |
| PX_TCV-946 TEMPERATURE CONTROL VALVE | A | 1 | 0 | 0.12 |
| PX_FCV-1719A LEAN AMINE FLOW CONTROL | B | 1 | 2 | 0.54 |
| PX_LCV-1028A HE-1831D LEVEL CONTROL | C | 1 | 0 | 0.12 |
| PX_TCV-606 VD-887 TEMP CONTROL | C | 1 | 0 | 0.12 |
| PX_TCV-697A HE-113B TEMP CONTROL | S | 1 | 1 | 0.12 |
Lead time and procurement
Lead time 141 ± 82 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Mar 2026 | PR05 Project / turnaround | 1 | Rp 3.1M | 28 May 2027 open | 424 d |
| 05 Jan 2026 | PR06 Regular replenishment | 2 | Rp 3.1M | 17 Jun 2026 | 163 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Jun 2026 | Medium | PX_FCV-621 | Install scaffolding at FCV-621 |
| 22 Jan 2026 | Medium | PX_FCV-621 | Leak from packing |
| 29 Sept 2025 | Low | PX_FCV-1719A | FCV-1719A passing |
| 24 Sept 2025 | Low | PX_FCV-621 | Replace lamp as per PM finding |
| 02 Aug 2025 | Medium | PX_TCV-697A | Install scaffolding at TCV-697A |
| 18 Jul 2025 | High | PX_FCV-621 | FCV-621 stuck |
| 04 May 2025 | Medium | PX_FCV-1719A | FCV-1719A; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Feb 2026 | 1 | 204000026249 | Preventive |