DIAPHRAGM,ACTUATOR,SIZE LS296,PTFE

Material 4100047595 · DIAPHRAGM · Plant 1000

AReorderCriticalStockout
Material
4100047595
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~134 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 26.3M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 13%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 269 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 376.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-827
BY PASS DUCT
A100.08
PX_PCV-861B
BY PASS DUCT
A100.08
PX_PCV-1141B
PRESSURE CONTROL VALVE
C110.51

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Jun 2025MediumPX_PCV-1141BPCV-1141B passing

Recent goods issues

Posting dateQtyOrderOrder type
05 Jan 20262201000012562Corrective