DIAPHRAGM,ACTUATOR,SIZE WW898,VITON
Material 4100047659 · DIAPHRAGM · Plant 1000
CReducePotentially obsolete
- Material
- 4100047659
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~134 days; expected demand during lead time 0.0.
- 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 18 exceeds the level to keep (1) by 17.
Price estimatedLead time estimated
On hand / on order
18 / 0
no open PO
Today Min / Max
10 / 28
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.0%
stockout risk now 0%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 538,488/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~46 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-639B HE-1437C LEVEL CONTROL | C | 1 | 2 | 0.55 |
| PX_LCV-742A LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Nov 2025 | High | PX_LCV-639B | Replace lamp as per PM finding |
| 11 May 2025 | Low | PX_LCV-639B | PSM25/Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.