Sparely
DU

DIAPHRAGM,ACTUATOR,MODEL DC614,INCOLOY

Material 4100047708 · DIAPHRAGM · Plant 1000

BReduceNon-moving
Material
4100047708
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~134 days; expected demand during lead time 0.0.
  • 3.A 97.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 16 exceeds the level to keep (1) by 15.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
16 / 0
no open PO
Today Min / Max
5 / 9
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.0%
stockout risk now 0%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 20.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~46 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1241A
CL-1475 TEMP CONTROL
B100.12
PX_FCV-763A
SLOP OIL FLOW CONTROL
C151.82
PX_PCV-1847B
PRESSURE CONTROL VALVE
S100.08

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_FCV-763AFCV-763A; valve hunting
29 Apr 2026MediumPX_FCV-763AFCV-763A; small leak at packing
25 Sept 2025MediumPX_FCV-763AFCV-763A passing
13 Sept 2025MediumPX_FCV-763AInstall scaffolding at FCV-763A
13 Jun 2025MediumPX_FCV-763APSM25/FCV-763A stuck

Recent goods issues

Never issued in the 17-month history.