DIAPHRAGM,ACTUATOR,MODEL BT304,A105
Material 4100047815 · DIAPHRAGM · Plant 1000
CReduceSlow-moving
- Material
- 4100047815
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 98 d · P80 191 d
- Unit price
- Rp 4.4M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~98 days; expected demand during lead time 0.1.
- 3.A 94.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 54 exceeds the level to keep (1) by 53.
Single source
On hand / on order
54 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
94.0%
stockout risk now 0%
Unit price
Rp 4.4M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~46 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-398 QUENCH OIL FLOW CONTROL | C | 1 | 1 | 0.11 |
Lead time and procurement
Lead time 98 ± 82 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Jul 2026 | PR06 Regular replenishment | 2 | Rp 4.4M | 31 Aug 2026 | 42 d |
| 14 May 2025 | PR06 Regular replenishment | 2 | Rp 4.3M | 29 Jun 2025 | 46 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Jun 2025 | Medium | PX_FCV-398 | Install scaffolding at FCV-398 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Jan 2026 | 1 | 201000012077 | Corrective |