Sparely
DU

DIAPHRAGM,ACTUATOR,MODEL OB629,SS316

Material 4100048174 · DIAPHRAGM · Plant 1000

BLong-leadMonitorSlow-moving
Material
4100048174
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
144 d · P80 191 d
Unit price
Rp 10.6M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~144 days; expected demand during lead time 0.4.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.2%
stockout risk now 1%
Unit price
Rp 10.6M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 210 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 81.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~46 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-706
VD-694 LEVEL CONTROL
B100.12
PX_PCV-1776A
BY PASS DUCT
C100.08
PX_FCV-1905D
HE-163D OUTLET FLOW
S100.11

Lead time and procurement

Lead time 144 ± 82 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
13 Apr 2026PR03
Regular replenishment
1Rp 10.5M09 Sept 2026149 d
10 Jul 2025PR06
Regular replenishment
2Rp 10.6M28 Dec 2025171 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
05 Mar 20263201000004588Corrective