DIAPHRAGM,ACTUATOR,TYPE QQ715,NBR

Material 4100048207 · DIAPHRAGM · Plant 1000

AReorderNormalBelow reorder point
Material
4100048207
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 1.8 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~134 days; expected demand during lead time 1.1 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 8.8M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 142 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-816
HE-234C TEMP CONTROL
A120.55

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_TCV-816Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 May 2026MediumPX_TCV-816TCV-816; valve hunting
27 May 2025MediumPX_TCV-816PSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
12 May 20261201000016405Corrective
11 May 20261201000016405Corrective