DIAPHRAGM,ACTUATOR,MODEL UF891,A182F11

Material 4100048432 · DIAPHRAGM · Plant 1000

CReorderHighStockout
Material
4100048432
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
134 d · P80 191 d
Unit price
Rp 4.4M (est.)

Recommendation

  • 1.Forecast 1.3 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~134 days; expected demand during lead time 0.9 (incl. 0.7 planned).
  • 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
Proposed purchase requisition
4 EA
Rp 17.5M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
98.1%
stockout risk now 100%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 196 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~46 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-274A
HE-1596B OUTLET FLOW
C130.96
PX_TCV-1250
KC-891A TEMP CONTROL
C100.12

Lead time and procurement

Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
09 Dec 2026PX_FCV-274AFinal Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Aug 2026MediumPX_FCV-274AFCV-274A; IA leak from regulator
14 Oct 2025MediumPX_FCV-274AFCV-274A; IA leak from regulator
25 May 2025LowPX_FCV-274AFCV-274A passing

Recent goods issues

Posting dateQtyOrderOrder type
19 Mar 20261205000022312Other maintenance