DIAPHRAGM,ACTUATOR,MODEL UF891,A182F11
Material 4100048432 · DIAPHRAGM · Plant 1000
CReorderHighStockout
- Material
- 4100048432
- Category
- DIAPHRAGM
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 134 d · P80 191 d
- Unit price
- Rp 4.4M (est.)
Recommendation
- 1.Forecast 1.3 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~134 days; expected demand during lead time 0.9 (incl. 0.7 planned).
- 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
Proposed purchase requisition
4 EA
Rp 17.5M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
98.1%
stockout risk now 100%
Unit price
Rp 4.4M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 196 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 11.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~46 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-274A HE-1596B OUTLET FLOW | C | 1 | 3 | 0.96 |
| PX_TCV-1250 KC-891A TEMP CONTROL | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 134 ± 82 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 09 Dec 2026 | PX_FCV-274A | Final Element Overhaul; Control Valve | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Aug 2026 | Medium | PX_FCV-274A | FCV-274A; IA leak from regulator |
| 14 Oct 2025 | Medium | PX_FCV-274A | FCV-274A; IA leak from regulator |
| 25 May 2025 | Low | PX_FCV-274A | FCV-274A passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Mar 2026 | 1 | 205000022312 | Other maintenance |