DIAPHRAGM,ACTUATOR,TYPE ZR602,A182F11

Material 4100048477 · DIAPHRAGM · Plant 1000

CReduceExcess
Material
4100048477
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
DUTA MANDIRI MAKMUR PT
Lead time
130 d · P80 191 d
Unit price
Rp 11.8M

Recommendation

  • 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~130 days; expected demand during lead time 0.6.
  • 3.A 74.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 6 exceeds the level to keep (2) by 4.
Single source
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
74.8%
stockout risk now 0%
Unit price
Rp 11.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 155 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 16.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~46 days.

Installed on 1 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-606
VD-887 TEMP CONTROL
C300.12

Lead time and procurement

Lead time 130 ± 82 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
17 Mar 2026PR03
Regular replenishment
1Rp 11.8M15 Jul 2026120 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
29 Apr 20263201000015007Corrective
15 Feb 20261204000026249Preventive