Sparely
DU

POSITIONER,VALVE,TYPE VN762,VITON

Material 4100048523 · POSITIONER · Plant 1000

AReorderCriticalStockout
Material
4100048523
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
A (21 of 53 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 7.8 EA/year: 7.8 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~95 days; expected demand during lead time 2.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 10.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 53 FuncLoc(s), 21 of them criticality A/B.
  • 6.ML early warning: 77% probability of demand in the next 90 days.
Proposed purchase requisition
10 EA
Rp 399.2M · order by 01 Oct 2026
Expected arrival ≈ 95 days
ML early warningConvert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 6
Rec. Max
10
order qty 2
Service level
99.9%
stockout risk now 78%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 77% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 36 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 53 functional locations

21 with criticality A/B · 65 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1444A
BY PASS LINE
A152.25
PX_FCV-1182
BY PASS LINE
A100.11
PX_FCV-1224
BY PASS LINE
A100.11
PX_FCV-1338A
HE-535C OUTLET FLOW
A100.11
PX_FCV-763
BY PASS LINE
A100.11
PX_FCV-823
C4 PRODUCT FLOW CONTROL
A100.11
PX_FCV-837C
HYDROGEN FLOW CONTROL
A100.11
PX_LCV-1441A
HE-961B LEVEL CONTROL
A100.12
PX_PCV-1542
PRESSURE CONTROL VALVE
A100.08
PX_PCV-1666
VD-450 PRESSURE CONTROL
A100.08
PX_PCV-1706A
PRESSURE CONTROL VALVE
A100.08
PX_PCV-1965C
HE-1941 PRESSURE CONTROL
A100.08

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026LowPX_FCV-651Overhaul FCV-651
20 Aug 2026MediumPX_FCV-651[MSI-B-26-RWX-113/M] Replace line
12 Jun 2026MediumPX_TCV-385TCV-385 passing
06 May 2026LowPX_FCV-1444AFCV-1444A passing
06 May 2026LowPX_LCV-1909LCV-1909; valve hunting
30 Apr 2026EmergencyPX_TCV-503TCV-503; small leak at packing
15 Apr 2026MediumPX_FCV-1444A[MSI-B-26-NLB-110] Permanent repair
06 Feb 2026MediumPX_TCV-385TCV-385; valve hunting
12 Jan 2026MediumPX_FCV-1444AFCV-1444A; valve hunting
17 Dec 2025LowPX_FCV-1444AFCV-1444A; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
26 Aug 20261201000003388Corrective
08 May 20262201000013320Corrective
14 Feb 20261201000013018Corrective
05 Feb 20261201000039107Corrective
06 Jan 20261201000011657Corrective
02 Nov 20252201000025438Corrective
01 Nov 20251201000025438Corrective
19 Oct 20252201000007780Corrective
19 Aug 20251201000026111Corrective