POSITIONER,VALVE,TYPE DC80,MONEL

Material 4100048547 · POSITIONER · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100048547
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (16 of 30 FuncLocs A/B)
Supplier
RAJAWALI SEJAHTERA ABADI PT
Lead time
92 d · P80 166 d
Unit price
Rp 25.4M

Recommendation

  • 1.Forecast 5.8 EA/year: 5.8 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~92 days; expected demand during lead time 1.5.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 30 FuncLoc(s), 16 of them criticality A/B.
  • 7.ML early warning: 48% probability of demand in the next 90 days.
Proposed purchase requisition
5 EA
Rp 126.9M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Long-leadML early warningSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.7%
stockout risk now 7%
Unit price
Rp 25.4M
PO history
ML early warning: 48% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 251 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 8 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 30 functional locations

16 with criticality A/B · 39 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1960
PRESSURE CONTROL VALVE
A140.94
PY_FCV-1903
BFW FLOW CONTROL
A120.54
PX_FCV-1588
PP-1325 OUTLET FLOW
A110.11
PX_FCV-314C
BY PASS LINE
A210.11
PX_FCV-1111
BY PASS LINE
A100.11
PX_FCV-1182
BY PASS LINE
A100.11
PX_FCV-1421
FEED FLOW CONTROL
A100.11
PX_PCV-1113
BY PASS DUCT
A300.08
PX_TCV-374
TEMPERATURE CONTROL VALVE
A100.12
PX_LCV-809
LEVEL CONTROL VALVE
B110.12
PX_PCV-389
PRESSURE CONTROL VALVE
B110.08
PX_PCV-655
PRESSURE CONTROL VALVE
B110.08

Lead time and procurement

Lead time 92 ± 64 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
07 Jul 2025PR06
Regular replenishment
2Rp 25.4M29 Sept 202584 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Aug 2026LowPX_LCV-256LCV-256; valve hunting
13 Jul 2026MediumPY_FCV-1903[MSI-B-26-ZCL-303/M] Replace line
07 Jul 2026MediumPX_PCV-1960[MSI-B-26-MWB-146] Permanent repair
05 Jun 2026MediumPX_LCV-256LCV-256; valve hunting
22 Mar 2026MediumPX_PCV-1960Leak from packing
09 Feb 2026HighPX_PCV-1960Install scaffolding at PCV-1960
11 Oct 2025MediumPX_LCV-256Replace lamp as per PM finding
26 May 2025MediumPX_FCV-314CFCV-314C; IA leak from regulator
22 May 2025MediumPX_PCV-389PCV-389; small leak at packing
21 May 2025LowPX_LCV-809Repair insulation LCV-809

Recent goods issues

Posting dateQtyOrderOrder type
23 Jan 20261201000017359Corrective
23 Jan 20262201000017359Corrective
22 Jan 20262201000017359Corrective
04 Jan 20261201000023515Corrective
31 Dec 20251201000039565Corrective
10 Nov 20252201000006937Corrective
09 Nov 20251201000006937Corrective
26 Oct 20251201000028069Corrective
25 Oct 20251201000028069Corrective