POSITIONER,VALVE,SIZE BX58,A105
Material 4100048562 · POSITIONER · Plant 1000
BLong-leadMonitorSlow-moving
- Material
- 4100048562
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (6 of 17 FuncLocs A/B)
- Supplier
- SURYA ENERGI JAYA PT
- Lead time
- 161 d · P80 166 d
- Unit price
- Rp 62.7M
Recommendation
- 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~161 days; expected demand during lead time 0.9.
- 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
- 4.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 17 FuncLoc(s), 6 of them criticality A/B.
- 6.ML early warning: 41% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceOpen PO
On hand / on order
3 / 5
next delivery 12 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
98.5%
stockout risk now 0%
Unit price
Rp 62.7M
PO history
ML early warning: 41% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 196 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 455.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.
Installed on 17 functional locations
6 with criticality A/B · 18 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1980A PP-1810A OUTLET FLOW | B | 1 | 3 | 0.96 |
| PX_FCV-146 BOTTOM FLOW CONTROL | B | 1 | 0 | 0.11 |
| PX_PCV-403 HE-492C PRESSURE CONTROL | B | 1 | 0 | 0.08 |
| PX_TCV-1974 HE-1967C TEMP CONTROL | B | 1 | 0 | 0.12 |
| PX_TCV-529 TEMPERATURE CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_TCV-761 PP-128A TEMP CONTROL | B | 1 | 0 | 0.12 |
| PX_LCV-1651B LEVEL CONTROL VALVE | C | 1 | 4 | 1.83 |
| PX_PCV-837 BY PASS DUCT | C | 1 | 1 | 0.08 |
| PX_FCV-1463A PP-1775A OUTLET FLOW | C | 1 | 0 | 0.11 |
| PX_LCV-474A LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
| PX_LCV-637 LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
| PX_PCV-1087 BY PASS DUCT | C | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 161 ± 64 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Feb 2026 | PR06 Regular replenishment | 2 | Rp 62.0M | 12 Dec 2026 open | 302 d |
| 29 Jan 2026 | PR06 Regular replenishment | 2 | Rp 59.4M | 04 Sept 2026 | 218 d |
| 24 Jan 2026 | PR06 Regular replenishment | 1 | Rp 63.5M | 03 Mar 2027 open | 403 d |
| 12 Dec 2025 | PR03 Regular replenishment | 2 | Rp 63.4M | 19 Apr 2027 open | 493 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Sept 2026 | Low | PX_LCV-1651B | Install cover plate for MCP cracking |
| 23 Jul 2026 | Low | PX_LCV-1651B | LCV-1651B; IA leak from regulator |
| 08 Jun 2026 | High | PX_FCV-1262B | Replace lamp as per PM finding |
| 22 Apr 2026 | Low | PX_LCV-1651B | LCV-1651B; IA leak from regulator |
| 15 Mar 2026 | Medium | PX_FCV-1980A | Repair insulation FCV-1980A |
| 23 Nov 2025 | Emergency | PX_FCV-1262B | FCV-1262B stuck |
| 31 Aug 2025 | Low | PX_FCV-1980A | FCV-1980A; small leak at packing |
| 12 Jun 2025 | Medium | PX_LCV-1651B | LCV-1651B stuck |
| 16 May 2025 | Low | PX_PCV-837 | PCV-837; IA leak from regulator |
| 08 May 2025 | Low | PX_FCV-1980A | FCV-1980A; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Mar 2026 | 1 | 205000022312 | Other maintenance |
| 29 Nov 2025 | 1 | 201000008592 | Corrective |
| 28 Nov 2025 | 1 | 201000017162 | Corrective |
| 23 Jun 2025 | 1 | 201000000633 | Corrective |