Sparely
DU

POSITIONER,VALVE,SIZE BX58,A105

Material 4100048562 · POSITIONER · Plant 1000

BLong-leadMonitorSlow-moving
Material
4100048562
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
B (6 of 17 FuncLocs A/B)
Supplier
SURYA ENERGI JAYA PT
Lead time
161 d · P80 166 d
Unit price
Rp 62.7M

Recommendation

  • 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~161 days; expected demand during lead time 0.9.
  • 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 17 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 41% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceOpen PO
On hand / on order
3 / 5
next delivery 12 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
98.5%
stockout risk now 0%
Unit price
Rp 62.7M
PO history
ML early warning: 41% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 196 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 455.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.

Installed on 17 functional locations

6 with criticality A/B · 18 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1980A
PP-1810A OUTLET FLOW
B130.96
PX_FCV-146
BOTTOM FLOW CONTROL
B100.11
PX_PCV-403
HE-492C PRESSURE CONTROL
B100.08
PX_TCV-1974
HE-1967C TEMP CONTROL
B100.12
PX_TCV-529
TEMPERATURE CONTROL VALVE
B100.12
PX_TCV-761
PP-128A TEMP CONTROL
B100.12
PX_LCV-1651B
LEVEL CONTROL VALVE
C141.83
PX_PCV-837
BY PASS DUCT
C110.08
PX_FCV-1463A
PP-1775A OUTLET FLOW
C100.11
PX_LCV-474A
LEVEL CONTROL VALVE
C100.12
PX_LCV-637
LEVEL CONTROL VALVE
C100.12
PX_PCV-1087
BY PASS DUCT
C100.08

Lead time and procurement

Lead time 161 ± 64 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
13 Feb 2026PR06
Regular replenishment
2Rp 62.0M12 Dec 2026
open
302 d
29 Jan 2026PR06
Regular replenishment
2Rp 59.4M04 Sept 2026218 d
24 Jan 2026PR06
Regular replenishment
1Rp 63.5M03 Mar 2027
open
403 d
12 Dec 2025PR03
Regular replenishment
2Rp 63.4M19 Apr 2027
open
493 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026LowPX_LCV-1651BInstall cover plate for MCP cracking
23 Jul 2026LowPX_LCV-1651BLCV-1651B; IA leak from regulator
08 Jun 2026HighPX_FCV-1262BReplace lamp as per PM finding
22 Apr 2026LowPX_LCV-1651BLCV-1651B; IA leak from regulator
15 Mar 2026MediumPX_FCV-1980ARepair insulation FCV-1980A
23 Nov 2025EmergencyPX_FCV-1262BFCV-1262B stuck
31 Aug 2025LowPX_FCV-1980AFCV-1980A; small leak at packing
12 Jun 2025MediumPX_LCV-1651BLCV-1651B stuck
16 May 2025LowPX_PCV-837PCV-837; IA leak from regulator
08 May 2025LowPX_FCV-1980AFCV-1980A; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
19 Mar 20261205000022312Other maintenance
29 Nov 20251201000008592Corrective
28 Nov 20251201000017162Corrective
23 Jun 20251201000000633Corrective