Sparely
DU

POSITIONER,VALVE,TYPE YV85,NBR

Material 4100048576 · POSITIONER · Plant 1000

ALong-leadReorderCriticalBelow reorder point
Material
4100048576
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 11 FuncLocs A/B)
Supplier
LANGIT MESINDO GLOBAL PT
Lead time
149 d · P80 227 d
Unit price
Rp 18.8M

Recommendation

  • 1.Forecast 6.5 EA/year: 6.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~149 days; expected demand during lead time 2.7.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 12.
  • 4.On hand 1 + on order 1 is at or below the reorder point: order 10 now.
  • 5.Long lead time: 80% of deliveries took up to 227 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 11 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 188.5M · order by 01 Oct 2026
Expected arrival ≈ 149 days
Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 27 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 7
Rec. Max
12
order qty 3
Service level
99.6%
stockout risk now 44%
Unit price
Rp 18.8M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 65 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 11 functional locations

6 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_FCV-1419A
BOTTOM FLOW CONTROL
A110.54
PX_FCV-484
BY PASS LINE
A100.11
PX_PCV-1747
BY PASS DUCT
A100.08
PY_LCV-1331
HE-1133B LEVEL CONTROL
A100.12
PX_FCV-407B
BY PASS LINE
B100.11
PX_TCV-761
PP-128A TEMP CONTROL
B100.12
PX_FCV-684C
CONTROL VALVE
C430.96
PX_FCV-465
PP-1029C OUTLET FLOW
C120.54
PX_FCV-1553
BY PASS LINE
C100.11
PX_FCV-338
HE-403A OUTLET FLOW
C100.11
PX_FCV-431
DILUTION STEAM FLOW CONTROL
C100.11

Lead time and procurement

Lead time 149 ± 52 days (PO history, 3 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
15 May 2026PR03
Regular replenishment
1Rp 17.8M27 Oct 2026
open
165 d
26 Jan 2026PR05
Project / turnaround
3Rp 19.3M29 Sept 2026246 d
27 Dec 2025PR03
Regular replenishment
2Rp 18.8M14 Jul 2026199 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Jul 2026LowPX_FCV-684CFCV-684C; IA leak from regulator
21 Dec 2025MediumPX_FCV-684CFCV-684C; IA leak from regulator
08 Oct 2025MediumPX_FCV-465Painting FCV-465
27 Jul 2025MediumPX_FCV-465Overhaul FCV-465
23 Jun 2025MediumPY_FCV-1419AFCV-1419A stuck
17 May 2025MediumPX_FCV-684CFCV-684C stuck

Recent goods issues

Posting dateQtyOrderOrder type
28 Jul 20261201000037064Corrective
27 Jul 20261201000037064Corrective
27 Jul 20262201000037064Corrective
16 May 20261201000001121Corrective
08 Jan 20262201000009440Corrective
01 Dec 20252201000016457Corrective