Sparely
DU

POSITIONER,VALVE,SIZE AR822,A105

Material 4100048612 · POSITIONER · Plant 1000

AReduceNon-moving
Material
4100048612
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~95 days; expected demand during lead time 0.0.
  • 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 16 exceeds the level to keep (1) by 15.
  • 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
16 / 0
no open PO
Today Min / Max
5 / 11
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.2%
stockout risk now 0%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 61.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 4 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_LCV-1331
HE-1133B LEVEL CONTROL
A100.12
PX_TCV-1022
TEMPERATURE CONTROL VALVE
B320.55
PX_TCV-514
HE-1904A TEMP CONTROL
B120.98
PX_FCV-727
LUBE OIL FLOW CONTROL
B100.11

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Apr 2026LowPX_TCV-514Leak from packing
14 Oct 2025LowPX_TCV-1022Replace lamp as per PM finding
04 Jul 2025LowPX_TCV-1022Painting TCV-1022
17 Jun 2025LowPX_TCV-514TCV-514 stuck

Recent goods issues

Never issued in the 17-month history.

Sparely