POSITIONER,VALVE,MODEL HX731,A182F11

Material 4100048633 · POSITIONER · Plant 1000

AReorderCriticalStockout
Material
4100048633
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~95 days; expected demand during lead time 0.3.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 119.8M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.8%
stockout risk now 22%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 828.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 7 functional locations

3 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1011A
PRESSURE CONTROL VALVE
A100.08
PY_LCV-1648B
PP-120B LEVEL CONTROL
A100.12
PX_FCV-1370
CONTROL VALVE
B120.96
PX_FCV-1147
CONTROL VALVE
C100.11
PX_TCV-1096A
PP-1370C TEMP CONTROL
C100.12
PX_PCV-402D
HE-495C PRESSURE CONTROL
S100.08
PY_FCV-249
CONTROL VALVE
S100.11

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Jun 2026MediumPX_FCV-1370FCV-1370 stuck
15 Jul 2025MediumPX_FCV-1370Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
13 May 20261201000022263Corrective
26 Jul 20251201000011319Corrective