Sparely
DU

POSITIONER,VALVE,TYPE AF626,SS316

Material 4100048663 · POSITIONER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100048663
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 9 FuncLocs A/B)
Supplier
GUNUNG PERKASA NUSANTARA PT
Lead time
152 d · P80 166 d
Unit price
Rp 24.3M

Recommendation

  • 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~152 days; expected demand during lead time 0.6.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 4.On hand 0 + on order 3 is at or below the reorder point: order 5 now.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 9 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 121.6M · order by 01 Oct 2026
Expected arrival ≈ 152 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 3
next delivery 02 Jan 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
99.8%
stockout risk now 3%
Unit price
Rp 24.3M
PO history
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 313 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 521.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 9 functional locations

7 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1709B
BY PASS DUCT
A110.08
PX_LCV-184
LEVEL CONTROL VALVE
A100.12
PX_PCV-585A
VD-1188A PRESSURE CONTROL
A100.08
PX_PCV-655
PRESSURE CONTROL VALVE
B110.08
PX_FCV-1525A
CONTROL VALVE
B100.11
PX_FCV-171A
BY PASS LINE
B100.11
PX_TCV-529
TEMPERATURE CONTROL VALVE
B100.12
PX_TCV-252C
PP-1139 TEMP CONTROL
S100.12
PY_PCV-649
BY PASS DUCT
S400.08

Lead time and procurement

Lead time 152 ± 64 days (PO history + category, 2 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
10 Sept 2026PR03
Regular replenishment
1Rp 24.9M14 Jan 2027
open
126 d
17 Jan 2026PR06
Regular replenishment
2Rp 23.8M02 Jan 2027
open
350 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 May 2025MediumPX_PCV-1709BPCV-1709B; small leak at packing
19 May 2025MediumPX_PCV-655PCV-655 stuck

Recent goods issues

Posting dateQtyOrderOrder type
22 Nov 20254201000030518Corrective
24 Aug 20251201000006861Corrective