POSITIONER,VALVE,SIZE KN642,MONEL
Material 4100048690 · POSITIONER · Plant 1000
AReorderCriticalStockout
- Material
- 4100048690
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 7 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 95 d · P80 166 d
- Unit price
- Rp 39.9M (est.)
Recommendation
- 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~95 days; expected demand during lead time 0.3.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 119.8M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 27%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 168 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.
Installed on 7 functional locations
4 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1448 RECYCLE ETHANE FLOW CONTROL | A | 1 | 4 | 0.96 |
| PX_TCV-1826B PP-1139 TEMP CONTROL | A | 1 | 2 | 0.55 |
| PX_FCV-1422A INHIBITOR FLOW CONTROL | B | 1 | 0 | 0.11 |
| PX_PCV-155 PRESSURE CONTROL VALVE | B | 1 | 0 | 0.08 |
| PX_FCV-1570B BY PASS LINE | C | 1 | 1 | 0.11 |
| PX_FCV-1552 PP-1022B OUTLET FLOW | C | 1 | 0 | 0.11 |
| PX_LCV-948B LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Jul 2026 | Low | PX_FCV-1448 | Install scaffolding at FCV-1448 |
| 29 Jun 2026 | Low | PX_FCV-1448 | FCV-1448; IA leak from regulator |
| 22 Apr 2026 | Medium | PX_FCV-1448 | FCV-1448 stuck |
| 20 Nov 2025 | Medium | PX_TCV-1826B | Overhaul TCV-1826B |
| 17 Jul 2025 | Medium | PX_FCV-1570B | PSM25/Install scaffolding at FCV-1570B |
| 04 Jul 2025 | Medium | PX_TCV-1826B | Install scaffolding at TCV-1826B |
| 13 May 2025 | Low | PX_FCV-1448 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Apr 2026 | 1 | 201000026573 | Corrective |
| 10 Feb 2026 | 1 | 201000021896 | Corrective |