POSITIONER,VALVE,SIZE KN642,MONEL

Material 4100048690 · POSITIONER · Plant 1000

AReorderCriticalStockout
Material
4100048690
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~95 days; expected demand during lead time 0.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 119.8M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 27%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 168 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 7 functional locations

4 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1448
RECYCLE ETHANE FLOW CONTROL
A140.96
PX_TCV-1826B
PP-1139 TEMP CONTROL
A120.55
PX_FCV-1422A
INHIBITOR FLOW CONTROL
B100.11
PX_PCV-155
PRESSURE CONTROL VALVE
B100.08
PX_FCV-1570B
BY PASS LINE
C110.11
PX_FCV-1552
PP-1022B OUTLET FLOW
C100.11
PX_LCV-948B
LEVEL CONTROL VALVE
C100.12

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Jul 2026LowPX_FCV-1448Install scaffolding at FCV-1448
29 Jun 2026LowPX_FCV-1448FCV-1448; IA leak from regulator
22 Apr 2026MediumPX_FCV-1448FCV-1448 stuck
20 Nov 2025MediumPX_TCV-1826BOverhaul TCV-1826B
17 Jul 2025MediumPX_FCV-1570BPSM25/Install scaffolding at FCV-1570B
04 Jul 2025MediumPX_TCV-1826BInstall scaffolding at TCV-1826B
13 May 2025LowPX_FCV-1448Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
16 Apr 20261201000026573Corrective
10 Feb 20261201000021896Corrective