POSITIONER,VALVE,TYPE OW115,CS
Material 4100048706 · POSITIONER · Plant 1000
ALong-leadReduceExcess
- Material
- 4100048706
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- GUNUNG PERKASA NUSANTARA PT
- Lead time
- 99 d · P80 166 d
- Unit price
- Rp 26.1M
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~99 days; expected demand during lead time 0.3.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 18 exceeds the level to keep (3) by 15.
- 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Long-leadConvert to Stock ItemSingle source
On hand / on order
18 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 26.1M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 5 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1156C PP-1323A OUTLET FLOW | A | 1 | 0 | 0.11 |
| PX_PCV-1453 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_FCV-274A HE-1596B OUTLET FLOW | C | 1 | 3 | 0.96 |
Lead time and procurement
Lead time 99 ± 64 days (PO history + category, 1 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 May 2025 | PR06 Regular replenishment | 1 | Rp 26.1M | 15 Sept 2025 | 111 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Aug 2026 | Medium | PX_FCV-274A | FCV-274A; IA leak from regulator |
| 14 Oct 2025 | Medium | PX_FCV-274A | FCV-274A; IA leak from regulator |
| 25 May 2025 | Low | PX_FCV-274A | FCV-274A passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2026 | 1 | 201000028432 | Corrective |
| 11 Oct 2025 | 1 | 201000005255 | Corrective |