POSITIONER,VALVE,TYPE FO338,MONEL
Material 4100048715 · POSITIONER · Plant 1000
ALong-leadReduceSlow-moving
- Material
- 4100048715
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 7 FuncLocs A/B)
- Supplier
- LANGIT TEKNOLOGI PERSADA PT
- Lead time
- 81 d · P80 166 d
- Unit price
- Rp 47.6M
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~81 days; expected demand during lead time 0.1.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 70 exceeds the level to keep (2) by 68.
- 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
- 7.ML early warning: 37% probability of demand in the next 90 days.
Long-leadML early warningSingle source
On hand / on order
70 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 47.6M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 267 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 349.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.
Installed on 7 functional locations
4 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-893 BY PASS LINE | A | 1 | 0 | 0.11 |
| PX_LCV-619A LEVEL CONTROL VALVE | A | 1 | 0 | 0.12 |
| PX_PCV-1965C HE-1941 PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_FCV-1003A BY PASS LINE | B | 1 | 0 | 0.11 |
| PX_FCV-1089 CONTROL VALVE | C | 1 | 0 | 0.11 |
| PX_FCV-1181A COOLING WATER FLOW CONTROL | C | 1 | 0 | 0.11 |
| PX_TCV-124A TEMPERATURE CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 81 ± 64 days (PO history + category, 1 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Jul 2026 | PR06 Regular replenishment | 2 | Rp 47.6M | 10 Aug 2026 | 37 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Jan 2026 | 1 | 201000039026 | Corrective |