POSITIONER,VALVE,TYPE FO338,MONEL

Material 4100048715 · POSITIONER · Plant 1000

ALong-leadReduceSlow-moving
Material
4100048715
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
LANGIT TEKNOLOGI PERSADA PT
Lead time
81 d · P80 166 d
Unit price
Rp 47.6M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~81 days; expected demand during lead time 0.1.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 70 exceeds the level to keep (2) by 68.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
  • 7.ML early warning: 37% probability of demand in the next 90 days.
Long-leadML early warningSingle source
On hand / on order
70 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 47.6M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 267 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 349.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 7 functional locations

4 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-893
BY PASS LINE
A100.11
PX_LCV-619A
LEVEL CONTROL VALVE
A100.12
PX_PCV-1965C
HE-1941 PRESSURE CONTROL
A100.08
PX_FCV-1003A
BY PASS LINE
B100.11
PX_FCV-1089
CONTROL VALVE
C100.11
PX_FCV-1181A
COOLING WATER FLOW CONTROL
C100.11
PX_TCV-124A
TEMPERATURE CONTROL VALVE
C100.12

Lead time and procurement

Lead time 81 ± 64 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
04 Jul 2026PR06
Regular replenishment
2Rp 47.6M10 Aug 202637 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
07 Jan 20261201000039026Corrective