POSITIONER,VALVE,MODEL DI624,SS304

Material 4100048778 · POSITIONER · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100048778
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
SURYA PERKASA SENTOSA PT
Lead time
89 d · P80 166 d
Unit price
Rp 51.8M

Recommendation

  • 1.Forecast 2.6 EA/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~89 days; expected demand during lead time 0.6.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 207.2M · order by 01 Oct 2026
Expected arrival ≈ 89 days
Long-leadLast turnaround used 2Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.6%
stockout risk now 4%
Unit price
Rp 51.8M
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 136 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 7 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-816
HE-234C TEMP CONTROL
A120.55
PX_TCV-852
TEMPERATURE CONTROL VALVE
A300.12
PX_LCV-1027A
PP-417 LEVEL CONTROL
B161.83
PX_TCV-1810B
VD-1149 TEMP CONTROL
B110.12
PX_FCV-236
BY PASS LINE
C110.54
PX_TCV-1203
PP-1478B TEMP CONTROL
C100.12
PX_PCV-1019A
HE-1569D PRESSURE CONTROL
S110.08

Lead time and procurement

Lead time 89 ± 64 days (PO history + category, 1 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
09 Aug 2025PR03
Regular replenishment
2Rp 51.8M20 Oct 202572 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Sept 2026LowPX_LCV-1027AReplace lamp as per PM finding
12 Aug 2026LowPX_LCV-1027ALCV-1027A stuck
15 Jul 2026LowPX_LCV-1027ALCV-1027A; valve hunting
10 May 2026MediumPX_TCV-816TCV-816; valve hunting
21 Jan 2026LowPX_LCV-1027A[MSI-B-26-GDK-273] Permanent repair
07 Nov 2025MediumPX_LCV-1027AInstall scaffolding at LCV-1027A
22 Jun 2025LowPX_FCV-236Repair insulation FCV-236
27 May 2025MediumPX_TCV-816PSM25/Leak from packing
18 May 2025MediumPX_TCV-1810BOverhaul TCV-1810B
05 May 2025MediumPX_LCV-1027A[MSI-B-25-FCR-137] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
18 May 20262201000034522Corrective
27 Dec 20252203000001878Turnaround