POSITIONER,VALVE,MODEL DI624,SS304
Material 4100048778 · POSITIONER · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100048778
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 7 FuncLocs A/B)
- Supplier
- SURYA PERKASA SENTOSA PT
- Lead time
- 89 d · P80 166 d
- Unit price
- Rp 51.8M
Recommendation
- 1.Forecast 2.6 EA/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~89 days; expected demand during lead time 0.6.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
- 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 207.2M · order by 01 Oct 2026
Expected arrival ≈ 89 days
Long-leadLast turnaround used 2Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.6%
stockout risk now 4%
Unit price
Rp 51.8M
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 136 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.
Installed on 7 functional locations
4 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-816 HE-234C TEMP CONTROL | A | 1 | 2 | 0.55 |
| PX_TCV-852 TEMPERATURE CONTROL VALVE | A | 3 | 0 | 0.12 |
| PX_LCV-1027A PP-417 LEVEL CONTROL | B | 1 | 6 | 1.83 |
| PX_TCV-1810B VD-1149 TEMP CONTROL | B | 1 | 1 | 0.12 |
| PX_FCV-236 BY PASS LINE | C | 1 | 1 | 0.54 |
| PX_TCV-1203 PP-1478B TEMP CONTROL | C | 1 | 0 | 0.12 |
| PX_PCV-1019A HE-1569D PRESSURE CONTROL | S | 1 | 1 | 0.08 |
Lead time and procurement
Lead time 89 ± 64 days (PO history + category, 1 PO lines) · on-time 25%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Aug 2025 | PR03 Regular replenishment | 2 | Rp 51.8M | 20 Oct 2025 | 72 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PX_LCV-1027A | Replace lamp as per PM finding |
| 12 Aug 2026 | Low | PX_LCV-1027A | LCV-1027A stuck |
| 15 Jul 2026 | Low | PX_LCV-1027A | LCV-1027A; valve hunting |
| 10 May 2026 | Medium | PX_TCV-816 | TCV-816; valve hunting |
| 21 Jan 2026 | Low | PX_LCV-1027A | [MSI-B-26-GDK-273] Permanent repair |
| 07 Nov 2025 | Medium | PX_LCV-1027A | Install scaffolding at LCV-1027A |
| 22 Jun 2025 | Low | PX_FCV-236 | Repair insulation FCV-236 |
| 27 May 2025 | Medium | PX_TCV-816 | PSM25/Leak from packing |
| 18 May 2025 | Medium | PX_TCV-1810B | Overhaul TCV-1810B |
| 05 May 2025 | Medium | PX_LCV-1027A | [MSI-B-25-FCR-137] Permanent repair |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 May 2026 | 2 | 201000034522 | Corrective |
| 27 Dec 2025 | 2 | 203000001878 | Turnaround |