POSITIONER,VALVE,SIZE LW189,MONEL

Material 4100048797 · POSITIONER · Plant 1000

BLong-leadReduceSlow-moving
Material
4100048797
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
B (2 of 3 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
118 d · P80 183 d
Unit price
Rp 63.4M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~118 days; expected demand during lead time 0.2.
  • 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 28 exceeds the level to keep (2) by 26.
  • 5.Long lead time: 80% of deliveries took up to 183 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
28 / 1
next delivery 08 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.7%
stockout risk now 0%
Unit price
Rp 63.4M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 287 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 112.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~40 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-685
CL-272 OUTLET FLOW
B100.11
PX_LCV-104
HE-1121A LEVEL CONTROL
B100.12
PX_TCV-745
PP-1161 TEMP CONTROL
C130.98

Lead time and procurement

Lead time 118 ± 69 days (PO history, 4 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
02 Jun 2026PR06
Regular replenishment
1Rp 65.8M08 Jan 2027
open
220 d
24 Mar 2026PR03
Regular replenishment
2Rp 65.6M17 Jul 2026115 d
29 Oct 2025PR06
Regular replenishment
1Rp 61.2M17 Dec 202549 d
27 Jun 2025PR06
Regular replenishment
1Rp 61.2M02 Dec 2025158 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Sept 2026LowPX_TCV-745TCV-745; IA leak from regulator
27 Jul 2026MediumPX_TCV-745Install cover plate for MCP cracking
22 Jul 2025LowPX_TCV-745Install scaffolding at TCV-745

Recent goods issues

Posting dateQtyOrderOrder type
18 Dec 20251201000035232Corrective