POSITIONER,VALVE,TYPE YX30,CS

Material 4100049256 · POSITIONER · Plant 1000

ALong-leadMaintainCritical insurance spare
Material
4100049256
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
125 d · P80 188 d
Unit price
Rp 41.9M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~125 days; expected demand during lead time 0.0.
  • 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Long lead time: 80% of deliveries took up to 188 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.7%
stockout risk now 0%
Unit price
Rp 41.9M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 33.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_FCV-894
CONDENSATE FLOW CONTROL
A120.96

Lead time and procurement

Lead time 125 ± 62 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
21 Oct 2025PR03
Regular replenishment
1Rp 40.0M07 Feb 2026109 d
19 Oct 2025PR03
Regular replenishment
1Rp 41.9M31 May 2026224 d
19 Aug 2025PR06
Regular replenishment
1Rp 42.1M30 Dec 2025133 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Nov 2025LowPY_FCV-894Overhaul FCV-894
24 Jun 2025LowPY_FCV-894Overhaul FCV-894

Recent goods issues

Never issued in the 17-month history.