POSITIONER,VALVE,TYPE YX30,CS
Material 4100049256 · POSITIONER · Plant 1000
ALong-leadMaintainCritical insurance spare
- Material
- 4100049256
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 125 d · P80 188 d
- Unit price
- Rp 41.9M
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~125 days; expected demand during lead time 0.0.
- 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Long lead time: 80% of deliveries took up to 188 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.7%
stockout risk now 0%
Unit price
Rp 41.9M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 33.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_FCV-894 CONDENSATE FLOW CONTROL | A | 1 | 2 | 0.96 |
Lead time and procurement
Lead time 125 ± 62 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Oct 2025 | PR03 Regular replenishment | 1 | Rp 40.0M | 07 Feb 2026 | 109 d |
| 19 Oct 2025 | PR03 Regular replenishment | 1 | Rp 41.9M | 31 May 2026 | 224 d |
| 19 Aug 2025 | PR06 Regular replenishment | 1 | Rp 42.1M | 30 Dec 2025 | 133 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Nov 2025 | Low | PY_FCV-894 | Overhaul FCV-894 |
| 24 Jun 2025 | Low | PY_FCV-894 | Overhaul FCV-894 |
Recent goods issues
Never issued in the 17-month history.