POSITIONER,VALVE,TYPE EV566,CS

Material 4100049277 · POSITIONER · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100049277
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
MEGA TEKNIK MAKMUR PT
Lead time
87 d · P80 166 d
Unit price
Rp 22.3M

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~87 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 22.3M · order by 01 Oct 2026
Expected arrival ≈ 87 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 22.3M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 378 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 241.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 5 functional locations

4 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-824
PRESSURE CONTROL VALVE
A100.08
PX_TCV-670A
HE-1874C TEMP CONTROL
A100.12
PX_LCV-482
CL-899 LEVEL CONTROL
B110.12
PX_FCV-1639
BY PASS LINE
B100.11
PX_LCV-1452
LEVEL CONTROL VALVE
C100.12

Lead time and procurement

Lead time 87 ± 64 days (PO history + category, 1 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
08 Feb 2026PR06
Regular replenishment
2Rp 22.3M13 Apr 202664 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 May 2025HighPX_LCV-482Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
18 Sept 20251201000013272Corrective