SEAT RING,VALVE,TYPE LX216,SS304
Material 4100050171 · SEAT RING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100050171
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (19 of 41 FuncLocs A/B)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 133 d · P80 177 d
- Unit price
- Rp 5.8M
Recommendation
- 1.Forecast 5.1 EA/year: 5.1 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~133 days; expected demand during lead time 1.8.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
- 4.On hand 0 + on order 1 is at or below the reorder point: order 10 now.
- 5.Long lead time: 80% of deliveries took up to 177 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 41 FuncLoc(s), 19 of them criticality A/B.
- 7.ML early warning: 38% probability of demand in the next 90 days.
Proposed purchase requisition
10 EA
Rp 57.6M · order by 01 Oct 2026
Expected arrival ≈ 133 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 08 Oct 2026
Today Min / Max
4 / 10
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
11
order qty 4
Service level
99.9%
stockout risk now 55%
Unit price
Rp 5.8M
PO history
ML early warning: 38% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 5 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.
Installed on 41 functional locations
19 with criticality A/B · 61 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1466B BY PASS DUCT | A | 1 | 2 | 0.51 |
| PY_FCV-894 CONDENSATE FLOW CONTROL | A | 1 | 2 | 0.96 |
| PX_FCV-1909 VD-1070A OUTLET FLOW | A | 1 | 1 | 0.54 |
| PX_PCV-1709B BY PASS DUCT | A | 1 | 1 | 0.08 |
| PX_PCV-629 PRESSURE CONTROL VALVE | A | 1 | 1 | 0.08 |
| PX_PCV-1049 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_PCV-820 HE-1547 PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_PCV-827 BY PASS DUCT | A | 1 | 0 | 0.08 |
| PX_PCV-984 KC-984C PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PY_PCV-437A BY PASS DUCT | A | 3 | 0 | 0.08 |
| PX_FCV-1047 BOTTOM FLOW CONTROL | B | 1 | 3 | 0.96 |
| PX_LCV-907 VD-1467 LEVEL CONTROL | B | 3 | 3 | 0.97 |
Lead time and procurement
Lead time 133 ± 52 days (PO history, 5 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Apr 2026 | PR06 Regular replenishment | 1 | Rp 5.7M | 08 Oct 2026 open | 171 d |
| 13 Feb 2026 | PR03 Regular replenishment | 4 | Rp 5.8M | 02 Sept 2026 | 201 d |
| 15 Nov 2025 | PR04 Regular (other) | 3 | Rp 5.8M | 03 May 2026 | 169 d |
| 09 Jun 2025 | PR03 Regular replenishment | 2 | Rp 5.7M | 31 Aug 2025 | 83 d |
| 08 Jun 2025 | PR06 Regular replenishment | 2 | Rp 5.8M | 26 Sept 2025 | 110 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Sept 2026 | Low | PX_PCV-1466B | PCV-1466B; valve hunting |
| 21 Aug 2026 | Medium | PX_FCV-303 | Leak from packing |
| 07 Jul 2026 | Medium | UT_LCV-710 | LCV-710; IA leak from regulator |
| 07 Jun 2026 | Low | PX_LCV-907 | Replace lamp as per PM finding |
| 02 Jun 2026 | Low | PX_TCV-931A | Install cover plate for MCP cracking |
| 29 May 2026 | Low | PX_PCV-372 | PCV-372 passing |
| 23 May 2026 | Medium | PX_FCV-1047 | FCV-1047 passing |
| 05 May 2026 | Medium | PX_LCV-907 | Replace lamp as per PM finding |
| 23 Apr 2026 | Medium | PX_FCV-134 | FCV-134 passing |
| 08 Apr 2026 | Medium | PX_PCV-1435 | PCV-1435; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2026 | 1 | 201000028026 | Corrective |
| 05 Aug 2026 | 1 | 204000027988 | Preventive |
| 30 Nov 2025 | 1 | 201000025823 | Corrective |
| 14 Nov 2025 | 1 | 201000001164 | Corrective |
| 03 Oct 2025 | 1 | 201000008171 | Corrective |
| 31 Aug 2025 | 1 | 203000006603 | Turnaround |
| 26 Aug 2025 | 1 | 203000006603 | Turnaround |
| 24 Aug 2025 | 1 | 201000014313 | Corrective |
| 06 Jun 2025 | 1 | 201000005139 | Corrective |