SEAT RING,VALVE,SIZE MU249,GRAPHITE
Material 4100050203 · SEAT RING · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100050203
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (9 of 16 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 110 d · P80 184 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Forecast 3.4 EA/year: 3.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~110 days; expected demand during lead time 1.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 8 now.
- 5.Installed on 16 FuncLoc(s), 9 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 90.2M · order by 01 Oct 2026
Expected arrival ≈ 110 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
9
order qty 3
Service level
99.9%
stockout risk now 54%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 14 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.
Installed on 16 functional locations
9 with criticality A/B · 21 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-377C TEMPERATURE CONTROL VALVE | A | 1 | 3 | 0.98 |
| PY_LCV-897 HE-1660A LEVEL CONTROL | A | 1 | 3 | 1.40 |
| PX_FCV-1315A BY PASS LINE | A | 1 | 2 | 0.54 |
| PX_PCV-629 PRESSURE CONTROL VALVE | A | 1 | 1 | 0.08 |
| PX_LCV-832D LEVEL CONTROL VALVE | A | 1 | 0 | 0.12 |
| PX_PCV-861B BY PASS DUCT | A | 1 | 0 | 0.08 |
| PY_FCV-198B CONTROL VALVE | A | 3 | 0 | 0.11 |
| PX_FCV-1107 QUENCH OIL FLOW CONTROL | B | 1 | 0 | 0.11 |
| PX_FCV-1733 SPENT CAUSTIC FLOW CONTROL | B | 1 | 0 | 0.11 |
| PX_FCV-134 SLOP OIL FLOW CONTROL | C | 1 | 2 | 0.54 |
| PX_LCV-1382 LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
| PX_LCV-230A HE-1454B LEVEL CONTROL | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Jul 2026 | Low | PX_TCV-377C | TCV-377C stuck |
| 21 May 2026 | Medium | PX_TCV-377C | Painting TCV-377C |
| 09 May 2026 | Medium | PY_LCV-897 | Overhaul LCV-897 |
| 23 Apr 2026 | Medium | PX_FCV-134 | FCV-134 passing |
| 19 Mar 2026 | Low | PX_FCV-1315A | FCV-1315A; IA leak from regulator |
| 30 Aug 2025 | Medium | PY_LCV-897 | LCV-897; IA leak from regulator |
| 17 Jun 2025 | Low | PX_TCV-377C | TCV-377C stuck |
| 15 Jun 2025 | Medium | PY_LCV-897 | LCV-897; IA leak from regulator |
| 25 May 2025 | Medium | PX_FCV-1315A | FCV-1315A; valve hunting |
| 14 May 2025 | Low | PX_PCV-629 | PCV-629; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Sept 2026 | 1 | 201000025977 | Corrective |
| 08 Jun 2026 | 2 | 201000027789 | Corrective |
| 05 Aug 2025 | 1 | 201000035301 | Corrective |