Sparely
DU

SEAT RING,VALVE,SIZE NH667,SS316

Material 4100050217 · SEAT RING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100050217
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 9 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
113 d · P80 184 d
Unit price
Rp 7.7M

Recommendation

  • 1.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~113 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 2 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 9 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 31.0M · order by 01 Oct 2026
Expected arrival ≈ 113 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 12 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 2%
Unit price
Rp 7.7M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 9 functional locations

3 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-529A
RICH AMINE FLOW CONTROL
A472.25
PX_TCV-1626
VD-272 TEMP CONTROL
A100.12
PX_FCV-1950A
BY PASS LINE
B100.11
PX_FCV-763A
SLOP OIL FLOW CONTROL
C151.82
PY_LCV-1154A
VD-1129 LEVEL CONTROL
C130.97
PX_FCV-870
PP-1748 OUTLET FLOW
C120.54
PX_FCV-1581A
BY PASS LINE
C100.11
PX_TCV-1312
TEMPERATURE CONTROL VALVE
C100.12
PX_PCV-1382
BY PASS DUCT
S100.08

Lead time and procurement

Lead time 113 ± 58 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
10 Jun 2026PR03
Regular replenishment
2Rp 7.6M12 Nov 2026
open
155 d
01 Mar 2026PR10
Other
2Rp 7.9M22 May 202682 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_FCV-763AFCV-763A; valve hunting
02 Sept 2026MediumPX_FCV-529AInstall scaffolding at FCV-529A
11 Aug 2026MediumPX_FCV-870[MSI-B-26-FHG-172/M] Replace line
17 May 2026MediumPX_FCV-529AFCV-529A; IA leak from regulator
29 Apr 2026MediumPX_FCV-763AFCV-763A; small leak at packing
05 Apr 2026MediumPX_FCV-529ARepair insulation FCV-529A
26 Mar 2026LowPX_FCV-529AFCV-529A passing
23 Jan 2026LowPX_FCV-529AReplace lamp as per PM finding
05 Nov 2025MediumPY_LCV-1154ALCV-1154A passing
25 Sept 2025MediumPX_FCV-763AFCV-763A passing

Recent goods issues

Posting dateQtyOrderOrder type
03 Dec 20251201000020924Corrective
17 Sept 20251201000000848Corrective