SEAT RING,VALVE,SIZE MG172,SS304

Material 4100050234 · SEAT RING · Plant 1000

AReorderCriticalStockout
Material
4100050234
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 9 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
91 d · P80 86 d
Unit price
Rp 8.0M

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~91 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 9 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 39.9M · order by 01 Oct 2026
Expected arrival ≈ 91 days
Convert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 34%
Unit price
Rp 8.0M
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 138 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 9 functional locations

5 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1322
PP-743D TEMP CONTROL
A110.12
PX_TCV-1654A
KC-513 TEMP CONTROL
A100.12
PX_TCV-293
TEMPERATURE CONTROL VALVE
A100.12
PX_PCV-1691B
BY PASS DUCT
B140.94
PY_LCV-191C
LEVEL CONTROL VALVE
B110.12
PX_TCV-1659A
VD-756B TEMP CONTROL
S110.12
PX_LCV-1822
KC-840A LEVEL CONTROL
S100.12
PX_PCV-945
HE-118B PRESSURE CONTROL
S100.08
PX_TCV-562
HE-643D TEMP CONTROL
S100.12

Lead time and procurement

Lead time 91 ± 42 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
14 Mar 2026PR06
Regular replenishment
1Rp 7.9M06 Jun 202684 d
16 Dec 2025PR06
Regular replenishment
2Rp 8.3M27 Jan 202642 d
10 May 2025PR06
Regular replenishment
1Rp 8.0M06 Aug 202588 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Sept 2026MediumPX_PCV-1691BInstall scaffolding at PCV-1691B
09 Jul 2026MediumPX_PCV-1691BPCV-1691B; IA leak from regulator
04 Mar 2026LowPX_PCV-1691BInstall scaffolding at PCV-1691B
08 Jul 2025MediumPX_PCV-1691BPCV-1691B; small leak at packing
12 May 2025MediumPX_TCV-1659APSM25/TCV-1659A; IA leak from regulator
10 May 2025MediumPX_TCV-1322Overhaul TCV-1322
03 May 2025MediumPY_LCV-191CPSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
16 May 20261201000011261Corrective
13 May 20261205000017276Other maintenance
27 Sept 20251201000015747Corrective