SEAT RING,VALVE,TYPE AN778,GRAPHITE

Material 4100050253 · SEAT RING · Plant 1000

AReduceSlow-moving
Material
4100050253
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
110 d · P80 184 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~110 days; expected demand during lead time 0.1.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 35 exceeds the level to keep (2) by 33.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
35 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 493 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 469.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 5 functional locations

4 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-184
LEVEL CONTROL VALVE
A100.12
PX_PCV-374A
PRESSURE CONTROL VALVE
A100.08
PX_LCV-1573B
KC-843 LEVEL CONTROL
B110.12
PX_PCV-266B
BY PASS DUCT
B100.08
PX_PCV-357A
PRESSURE CONTROL VALVE
C120.51

Lead time and procurement

Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_PCV-357AOverhaul PCV-357A
23 May 2025MediumPX_PCV-357AOverhaul PCV-357A
10 May 2025MediumPX_LCV-1573BInstall scaffolding at LCV-1573B

Recent goods issues

Posting dateQtyOrderOrder type
26 May 20251201000018121Corrective