SEAT RING,VALVE,MODEL YA551,A105
Material 4100050260 · SEAT RING · Plant 1000
AMonitorInsurance gap
- Material
- 4100050260
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (6 of 9 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 110 d · P80 184 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~110 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 6%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 271.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.
Installed on 9 functional locations
6 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1236 KC-713B LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_LCV-1990 PP-1498C LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_PCV-650 BY PASS DUCT | A | 1 | 0 | 0.08 |
| UT_LCV-880A LEVEL CONTROL VALVE | A | 1 | 0 | 0.12 |
| PX_FCV-634B BY PASS LINE | B | 1 | 0 | 0.11 |
| PX_TCV-1650 TEMPERATURE CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_PCV-247 PRESSURE CONTROL VALVE | C | 1 | 1 | 0.08 |
| PX_PCV-1531D BY PASS DUCT | C | 1 | 0 | 0.08 |
| PX_LCV-1691A LEVEL CONTROL VALVE | S | 1 | 9 | 3.97 |
Lead time and procurement
Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Sept 2026 | High | PX_LCV-1691A | [MSI-B-26-KJJ-391/M] Replace line |
| 22 Jul 2026 | Medium | PX_LCV-1691A | LCV-1691A; small leak at packing |
| 02 Apr 2026 | Low | PX_LCV-1691A | LCV-1691A; valve hunting |
| 11 Mar 2026 | Low | PX_LCV-1691A | Replace lamp as per PM finding |
| 07 Mar 2026 | Low | PX_LCV-1691A | Install cover plate for MCP cracking |
| 27 Feb 2026 | Low | PX_LCV-1691A | Leak from packing |
| 02 Jan 2026 | Medium | PX_LCV-1691A | LCV-1691A; IA leak from regulator |
| 30 Dec 2025 | Medium | PX_LCV-1691A | Leak from packing |
| 23 Jul 2025 | Low | PX_LCV-1691A | LCV-1691A passing |
| 02 May 2025 | High | PX_PCV-247 | [MSI-B-25-GWT-126/M] Replace line |
Recent goods issues
Never issued in the 17-month history.