SEAT RING,VALVE,TYPE KA462,GRAPHITE

Material 4100050274 · SEAT RING · Plant 1000

ALong-leadReduceSlow-moving
Material
4100050274
Category
SEAT RING
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
106 d · P80 184 d
Unit price
Rp 56.9M

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~106 days; expected demand during lead time 0.2.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 5 exceeds the level to keep (3) by 2.
  • 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
  • 7.ML early warning: 37% probability of demand in the next 90 days.
Long-leadML early warningSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 56.9M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 215 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 7 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1887C
BY PASS DUCT
A120.94
PX_LCV-1990
PP-1498C LEVEL CONTROL
A100.12
PX_TCV-1552B
TEMPERATURE CONTROL VALVE
A100.12
PX_TCV-1874A
KC-885A TEMP CONTROL
B100.12
PX_PCV-679
PRESSURE CONTROL VALVE
C120.51
PX_PCV-1759B
BY PASS DUCT
C100.08
PX_PCV-538
HE-876B PRESSURE CONTROL
S300.08

Lead time and procurement

Lead time 106 ± 58 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
30 May 2025PR03
Regular replenishment
2Rp 56.9M31 Aug 202593 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Jun 2026MediumPX_PCV-1887CInstall cover plate for MCP cracking
29 Jan 2026MediumPX_PCV-679Install cover plate for MCP cracking
16 Jul 2025MediumPX_PCV-1887CPCV-1887C stuck
04 May 2025LowPX_PCV-679PSM25/PCV-679; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
28 Feb 20261201000013980Corrective