Sparely
DU

SEAT RING,VALVE,SIZE PH290,A182F11

Material 4100050313 · SEAT RING · Plant 1000

AReduceNon-moving
Material
4100050313
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
110 d · P80 184 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~110 days; expected demand during lead time 0.0.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 6 exceeds the level to keep (1) by 5.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 24.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 4 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1081A
CONTROL VALVE
A100.11
PX_LCV-158
PP-1143B LEVEL CONTROL
B300.12
PX_TCV-245
HE-1507C TEMP CONTROL
B100.12
PX_PCV-1968
PRESSURE CONTROL VALVE
C100.08

Lead time and procurement

Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.

Sparely