SEAT RING,VALVE,SIZE LY983,VITON

Material 4100050348 · SEAT RING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100050348
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
109 d · P80 184 d
Unit price
Rp 11.3M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~109 days; expected demand during lead time 0.0.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 11.3M · order by 01 Oct 2026
Expected arrival ≈ 109 days
Long-leadLast turnaround used 2Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.3%
stockout risk now 1%
Unit price
Rp 11.3M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 31.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 5 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1295
CL-1039 OUTLET FLOW
A100.11
PX_TCV-1241A
CL-1475 TEMP CONTROL
B100.12
PX_TCV-1851
PP-1056 TEMP CONTROL
C120.12
PX_PCV-812C
PP-1934A PRESSURE CONTROL
C100.08
PX_TCV-1757A
TEMPERATURE CONTROL VALVE
C100.12

Lead time and procurement

Lead time 109 ± 58 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
26 Feb 2026PR06
Regular replenishment
1Rp 11.3M13 Jun 2026107 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_TCV-1851Install scaffolding at TCV-1851
09 May 2025HighPX_TCV-1851TCV-1851 stuck

Recent goods issues

Posting dateQtyOrderOrder type
11 Nov 20252203000023445Turnaround