SEAT RING,VALVE,SIZE LY983,VITON
Material 4100050348 · SEAT RING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100050348
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 5 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 109 d · P80 184 d
- Unit price
- Rp 11.3M
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~109 days; expected demand during lead time 0.0.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
- 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 11.3M · order by 01 Oct 2026
Expected arrival ≈ 109 days
Long-leadLast turnaround used 2Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.3%
stockout risk now 1%
Unit price
Rp 11.3M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 31.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1295 CL-1039 OUTLET FLOW | A | 1 | 0 | 0.11 |
| PX_TCV-1241A CL-1475 TEMP CONTROL | B | 1 | 0 | 0.12 |
| PX_TCV-1851 PP-1056 TEMP CONTROL | C | 1 | 2 | 0.12 |
| PX_PCV-812C PP-1934A PRESSURE CONTROL | C | 1 | 0 | 0.08 |
| PX_TCV-1757A TEMPERATURE CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 109 ± 58 days (PO history + category, 1 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Feb 2026 | PR06 Regular replenishment | 1 | Rp 11.3M | 13 Jun 2026 | 107 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Sept 2026 | Medium | PX_TCV-1851 | Install scaffolding at TCV-1851 |
| 09 May 2025 | High | PX_TCV-1851 | TCV-1851 stuck |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Nov 2025 | 2 | 203000023445 | Turnaround |